background image

State of Machine

Cause

Chec

k point

Content of confir

mation

4) 

The control pr

inting wir

ing board setting

    is def

ectiv

e

.

3) Connected mistak

e

3) Connected mistak

e

2) Output wir

ing supply re

v

erse-phase

.

1) P

o

w

er supply re

v

erse-phase

.

2) P

o

w

er supply re

v

erse-phase

.

    Output wir

ing re

v

erse-phase

.

The phase of f

an motor output wir

ing is

confir

med.

  (TB OUT)

The phase of f

an motor output wir

ing is

confir

med.

  (TB OUT)

The phase of input v

oltage is confir

med

(TB IN)

The phase of input v

oltage is confir

med

(TB IN)

The set of dip s

witch is confir

med.

 (SW0-3)

(P2) 

It is confir

med that the s

witch setting is

corresponding to the electr

ic wir

ing diag

ram.

The control substr

ate is matched to setting the

electr

ic wir

ing diag

ram.

 

The f

an controller connection is confir

med.

The f

an controller connection is confir

med.

The input v

oltage is confir

med.

 (CN04)

Is the phase of U

V

W correct?

Is the phase of L1, L2, L3 correct?

Is the phase of U

V

W correct?

Is the phase of L1, L2, L3 correct?

T

roub

leshooting

The phase of U

V

W is corrected.

 

The connected phase is confir

med.

 

The wir

ing mistak

e is corrected.

  

The phase of L1, L2,L3 is corrected.

  

The phase of U

V

W is corrected.

 

The phase of L1, L2,L3 is corrected.

  

NF-SCRM-TB OUT (The connection phase

is noted.)

CNU

, CNV

, CNW

-SCRM 

(The connection is noted.)

Is not A

C198-264V input in CN04? 

TB IN-NF wir

ing (The connection phase is noted.)

12

2.

 The f

an rotates 

   oppositely

.  

3.

 The rotation speed

  of f

ans cannot control.

Something wrong

occurs b

y step2-2 dr

iv

e

confir

mation of installed

confir

mation matter

.

     

It becomes high-

pressure abnor

mal

pressure

1) Dur

ing heating dr

iv

e

Dur

ing heating dr

iv

e

, there is an input in CN04 and

the f

an becomes full load dr

iv

e

.      Nor

mality  

CN04- the wir

ing f

or full load input in heating

(CN04 input is A

C198-264V in heating.) 

There m

ust not be connector connection in

CNX.

(CNX is compulsion full load input.

Full load when shor

t-circuited.) 

NF-SCRM-TB OUT

 (The connection phase is

noted.)

CNU

, CNV

, CNW

-SCRM

(The connection is noted.)

TB IN-NF wir

ing (The connection phase is

noted.)

TB IN-T01-CN02 (The connection phase is

noted.)

CN02- ther

mistor

The connected phase is confir

med.

 

The wir

ing mistak

e is corrected.

  

In cooling, when there is an input in CN04, wir

ing

of CN04 is mistak

e connection.

The wir

ing is corrected.

  

When there is an input in CN04, the f

an is full load..

  

When there is a connector connection in CNX, 

it is remo

v

ed.

The unit side connection is confir

med.

The connected phase is confir

med.

 

The wir

ing mistak

e is corrected.

  

TB OUT - f

an motor 

(The phase (U

V

W) is noted.)

P

osition of the wir

ing f

or full load input

(In heating)

Installation position of ther

mistor

If the position where the ther

mistor is installed is

wrong, the rotation speed control of the f

an as

condensing temper

ature is impossib

le

5) 

The th

yr

istor module

 (SCRM) 

is def

ectiv

e

.  

The content of P14 is chec

k

ed.

 (SCRM)

The content of P14 is judgment.

 (SCRM)

SCRM e

xchange when abnor

mality is f

ound.

 

Summary of Contents for PAC-205FC

Page 1: ... the correct safe install before installation 2 The customer must not install and not transfer the unit by themselves Safety and the function cannot be secured PAC 205FC CONTENTS CONTENTS 1 Safety precautions 2 Outline 3 Caution 4 Parts 5 Installation 6 Before starting the trial run 7 Troubleshooting PAGE 1 2 2 2 3 10 11 ...

Page 2: ...erformed improperly electric shock or fire may result If you need to have the unit repaired or moved consult your dealer 2 Before constructing the installation or transfer Do not touch the metal edges inside the unit without wearing glove on your hands Touching directly it may injure your hands Do not touch the compressor or refrigerant piping without wearing glove on your hands Touching directly ...

Page 3: ...ease consider the soundproofing wall equipment etc when using the fan controller in the place where the noise becomes a problem There is no worry which interferes to the unit though an electromagnetic sound might be generated from fan motor 3 When shipping the fan controller the dip switch on the control circuit board is set as follows Do not change factory set of all dip switches Accessory assy 1...

Page 4: ...trol box cover Earth sticker Fan controller Fan controller 1 The wiring from the printed circuit board CN04 is pulled out In case of PU 7 8 10 only CN04 Fan controller inside 2 Disconnect connector C11 C11 and C21 C21 The connector C11 and C21 remove to the motor side and the control box side F C N Control box MF2 MF3 Terminal block C11 C11 C21 C21 3 Cover the connector C11 control box side is cap...

Page 5: ...x side Control box MF2 MF3 Terminal block C11 C11 C21 C21 3 When the fan controller is installed the connector is connected in the control box The wiring from CN04 connect to the terminal block F C N in the control box In case of PUH 15 20 Please be careful do not damage wires by the sheet metal edges or the fin etc pull out 6 Please use the pipe cover 2x1 pieces and fix with the band 2x2 pieces 5...

Page 6: ...n controller is installed the connector is connected in the control box The wiring from CN04 connect to the terminal block F C N in the control box Please be careful do not damage wires by the sheet metal edges or the fin etc 5 Please use the pipe cover 1 piece and fix with the band 2 pieces 5 1 2 Wiring 3 After connect wiring to prevent wiring being damaged with the pipe header the pipe cover 2 p...

Page 7: ...nd band 4 pieces are used In that time never bundle the thermistor wiring with other wiring 5 After wiring ends the wiring is bundled with a remaining band Never bundle the thermistor and other wiring together 6 Ensure there is not wiring mistake found then only install the controller box cover and service panel Fan controller Earth sticker Unit wiring sticker Fan controller 2 Disconnect connector...

Page 8: ...ends the wiring is bundled with a remaining band Never bundle the thermistor and other wiring together 6 Ensure there is not wiring mistake found then only install the controller box cover and service panel Earth sticker 3 When the fan controller is installed the connector is connected in the control box Please be careful do not damage wires by the sheet metal edges or the fin etc Pipe cover Band ...

Page 9: ...re used In that time never bundle the thermistor wiring with other wiring 4 After wiring ends the wiring is bundled with a remaining band Never bundle the thermistor and other wiring together 5 Ensure there is not wiring mistake found then only install the controller box cover and service panel Fan controller Earth sticker Unit wiring sticker Fan controller 1 Disconnect connector C11 C11 The conne...

Page 10: ...ring is bundled with a remaining band Never bundle the thermistor and other wiring together 5 Ensure there is not wiring mistake found then only install the controller box cover and service panel 2 When the fan controller is installed the connector is connected in the control box The wiring from CN04 connect to the terminal block F C N in the control box Earth sticker Please be careful do not dama...

Page 11: ...essure switch off Whether LED01 has blinked is confirmed When the unit is in operation the fan controller output voltage measured in TB OUT and checked whether the output of about 200V There is a problem when it is an output of about 300V Step 2 3 The thermistor for the condensing temperature detection is surely connected with CN01 as before Step 2 4 Step 1 5 Is the thermistor for the condensing t...

Page 12: ... controller connection state if abnormality relapses the control printing board is defective and exchange Replace SCRM when abnormality is found At the time of turning on light always The CN01 connector is removed and measures resistance When the resistance is 1 kilo ohm or less repair the control printing board due to the thermistor short circuit breakdown In case of thermistor is correct the con...

Page 13: ...ted 12 2 The fan rotates oppositely 3 The rotation speed of fans cannot control Something wrong occurs by step2 2 drive confirmation of installed confirmation matter It becomes high pressure abnormal pressure 1 During heating drive During heating drive there is an input in CN04 and the fan becomes full load drive Normality CN04 the wiring for full load input in heating CN04 input is AC198 264V in ...

Page 14: ...e and exchange After checking item 1 5 when the power supply is turned on the blinking of LED01 is confirmed 3 The control printing wiring board is defective Item 1 is checked again After checking item 1 there is a possibility of a defective printed circuit board if a normal drive is not done After checking item 1 if there is no problem the control printing board is defective and exchange 13 4 The...

Page 15: ...ues 1 Check between G and K Use the smallest resistance range on the tester Judgment Value 1 5 ohm 80 ohm 14 Judgment Values 2 External View Internal Circuit Diagrams Check between AK1 and AK2 Use the greatest resistance range on the tester Judgment Value 60 kilo ohm ohm K AK1 AK1 AK1 AK1 AK2 AK2 AK2 AK2 G K G K G G K G K G K K K AK1 AK2 G G K K AK1 AK2 G G G K G K ...

Page 16: ...00 0005 TELEX J24532 CABLE MELCO TOKYO Specifications subject to change without notice WT03134X01 This product is designed and intended for use in the residential commercial and light industrial environment Low Voltage Directive 73 23 EEC Electromagnetic Compatibility Directive 89 336 EEC The product at hand is based on the following EU regulations Printed in Malaysia ...

Reviews: