![Mitsubishi Electric NZ2GF-CCB User Manual Download Page 73](http://html.mh-extra.com/html/mitsubishi-electric/nz2gf-ccb/nz2gf-ccb_user-manual_1811813073.webp)
71
CHAPTER 8 PROGRAMMING
8
8.
2 Ex
ample of
Comm
unicat
ion
s
wit
h
CC
-Link Remot
e
S
tat
ions
3.
Display the "CC IE Field Configuration" window and configure the setting as follows.
[CC IE Field Configuration Setting] button
4.
Display the refresh parameter setting window and configure the setting as follows.
[Refresh Parameters] button
5.
Write the set parameters to the CPU module of the master station and reset or power off then on
the CPU module.
[Online]
[Write to PLC...]
Use the default values for parameters other than those shown in the program example above. For parameters, refer to the
following.
User's manual for the master/local module used
or Power OFF ON
RESET
Summary of Contents for NZ2GF-CCB
Page 1: ...CC Link IE Field Network CC Link Bridge Module User s Manual NZ2GF CCB ...
Page 2: ......
Page 9: ...7 Memo ...
Page 35: ...33 CHAPTER 4 THE PROCEDURE BEFORE OPERATION 4 Memo ...
Page 145: ...I 4 4 7 8 143 Memo ...
Page 149: ......