OPERATING PROCEDURE
3+2726),*85(6
5HPRYLQJWKHH[SDQVLRQYDOYH
NOTE:
Gas recovery is not required if the unit is pumped down.
(1) Remove the top panel and the service panel (Refer to
section 1).
(2) Disconnect the power supply cord and indoor/outdoor
connecting wires.
(3) Remove all the LEV coils.
(4) Detach all the brazed parts of the expansion valves and
pipes.
%HIRUHXVLQJWKHVHUYLJKSUHVVXUHVLGH
(1) Remove the service panel (Photo 1).
(2) Disconnect the power supply cord and indoor/outdoor
connecting wires.
(3) Remove the top panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(4) Disconnect all the connectors and the lead wires on the
outdoor control P.C. board.
(5) Remove all the screws of outdoor control P.C. board holder,
and remove the outdoor control P.C. board holder (Photo 5).
(6) Make sure that the service port is visible.
Photo 12
105
Expansion
valves
Photo 11
LEV coils
Service port
(High pressure side)
OBH702G
Summary of Contents for MXZ-2C20NA2-U1
Page 19: ...19 MXZ 4C36NA MXZ 4C36NA2 Unit inch mm Lock nut Conduit plates Conduit connector OBH702G ...
Page 21: ...21 MXZ 2C20NAHZ MXZ 2C20NAHZ2 Unit inch mm Lock nut Conduit connector Conduit plate OBH702G ...
Page 24: ...24 MXZ 3C24NA MXZ 3C30NA OBH702G ...
Page 25: ...25 MXZ 3C24NA2 MXZ 3C30NA2 OBH702G ...
Page 26: ...26 MXZ 4C36NA OBH702G ...
Page 27: ...27 MXZ 4C36NA2 OBH702G ...
Page 29: ...29 MXZ 5C42NA2 OBH702G ...
Page 30: ...30 MXZ 2C20NAHZ OBH702G ...
Page 31: ...31 MXZ 2C20NAHZ2 OBH702G ...
Page 32: ...32 MXZ 3C24NAHZ MXZ 3C30NAHZ OBH702G ...