OPERATING PROCEDURE
3+2726),*85(6
5HPRYLQJ
the panels
(1) Remove all the screws fixing the top panel, and remove
the top panel.
(2) Remove all the screws fixing the service panel.
(3) Pull down on the service panel, and remove the service
panel.
(4) Disconnect the power supply cord and indoor/outdoor
connecting wires.
(5) Remove all the screws fixing the front panel, and remove
the front panel.
(6) Remove all the screws fixing the back panel, and remove
the back panel.
106
12-2. MXZ-3C24NA
MXZ-3C30NA
MXZ-4C36NA
MXZ-3C24NA2 MXZ-3C30NA2
MXZ-4C36NA2
Photos: MXZ-4C36NA
MXZ-4C36NA2
127(7XUQ2))WKHSRZHUVXSSO\EHIRUHGLVDVVHPEO\
Photo 1
Photo 3
Screws of the service panel
Service panel
Screws of the front panel
Catch of the front panel
Catch of the front panel
Screws of the top panel
Screws of the front panel
Screws of the top panel
Screws of the back panel
Photo 2
OBH702G
Summary of Contents for MXZ-2C20NA2-U1
Page 19: ...19 MXZ 4C36NA MXZ 4C36NA2 Unit inch mm Lock nut Conduit plates Conduit connector OBH702G ...
Page 21: ...21 MXZ 2C20NAHZ MXZ 2C20NAHZ2 Unit inch mm Lock nut Conduit connector Conduit plate OBH702G ...
Page 24: ...24 MXZ 3C24NA MXZ 3C30NA OBH702G ...
Page 25: ...25 MXZ 3C24NA2 MXZ 3C30NA2 OBH702G ...
Page 26: ...26 MXZ 4C36NA OBH702G ...
Page 27: ...27 MXZ 4C36NA2 OBH702G ...
Page 29: ...29 MXZ 5C42NA2 OBH702G ...
Page 30: ...30 MXZ 2C20NAHZ OBH702G ...
Page 31: ...31 MXZ 2C20NAHZ2 OBH702G ...
Page 32: ...32 MXZ 3C24NAHZ MXZ 3C30NAHZ OBH702G ...