5
4
OUTLINES AND DIMENSIONS
20.8
6.
4
4
1
6.
9
8
255
145.5
Service panel
Service port
Air out
Liquid refrigerant pipe joint
Refrigerant pipe (flared)
;
6.35
Gas refrigerant pipe joint
Refrigerant pipe (flared)
;
9.52
3
4
0
4
REQUIRED SPACE
Basically open 100mm or more
without any obstruction in front
and on both sides of the unit.
e
r
o
m
r
o
m
m
0
5
3
e
r
o
m
r
o
m
m
0
0
1
e
r
o
m
r
o
m
m
0
0
1
e
r
o
m
r
o
m
m
0
0
1
Open two sides of left,
right, or rear side.
Air in
Air in
381.5
Drain hole
;
33
r
of
hct
i
p tl
o
B
n
oit
all
at
s
ni
0
8
2
~
4
6
2
0
0
3
0
4
5
0
7
2
0
1
5.
7
4
5.
2
2
17.5
243
Bolt pitch for installation
500
684
61
105
Handle
2 holes 10
'
16
40
Unit : mm
Unit : mm
0
1
69
800
302.5
500 Bolt pitch for installation
150
22.3
Handle
0
5
5
0
8
2
5.
4
6
1
5.
9
9
170.5
23
Service panel
Service port
5
8
2
5.
4
4
3
4
4
400
Air in
Air out
5.
7
1
r
of
h
cti
p t
l
o
B
n
oit
all
at
s
ni
5
2
3
~
4
0
3
40
Liquid refrigerant pipe joint
Refrigerant pipe (flared)
;
6.35
Gas refrigerant pipe joint
Refrigerant pipe (flared)
3 4
5
3
2 holes 10
'
21
REQUIRED SPACE
Basically open 100mm or more
without any obstruction in front
and on both sides of the unit.
e
r
o
m
r
o
m
m
0
5
3
e
r
o
m
r
o
m
m
0
0
2
e
r
o
m
r
o
m
m
0
0
1
e
r
o
m
r
o
m
m
0
0
1
Open two sides of left,
right, or rear side.
Drain hole
;
42
Air in
;
9.52 (MU-GD10ND)
;
12.7 (MU-GD12ND)
MU-GD08ND
MU-GD10ND
MU-GD12ND
Summary of Contents for MU-GD08ND
Page 6: ...6 WIRING DIAGRAM 5 MU C08VC MU C10VC MU C13VC MU GD08ND MU GD10ND ...
Page 18: ......
Page 19: ......