4.2. Connecting pipes (Fig. 4-1)

•   When commercially available copper pipes are used, wrap liquid and gas pipes 

with commercially available insulation materials (heat-resistant to 100 °C or more, 

thickness of 12 mm or more).

•   The  indoor  parts  of  the  drain  pipe  should  be  wrapped  with  polyethylene  foam 

insulation materials (specific gravity of 0.03, thickness of 9 mm or more).

•   Apply thin layer of refrigerant oil to pipe and joint seating surface before tightening 

flare nut. 

A

•   Use two wrenches to tighten piping connections. 

B

•   Use leak detector or soapy water to check for gas leaks after connections are 

completed.

•   Apply refrigerating machine oil over the entire flare seat surface. 

C

•   Use the flare nuts for the following pipe size. 

D

Gas side

Pipe size (mm)

ø15.88

Liquid side

Pipe size (mm)

ø9.52

•   When bending the pipes, be careful not to break them. Bend radii of 100 mm to 

150 mm are sufficient.

•   Make sure the pipes do not contact the compressor. Abnormal noise or vibration 

may result.

1

 Pipes must be connected starting from the indoor unit.

  Flare nuts must be tightened with a torque wrench.

2

  Flare the liquid pipes and gas pipes and apply a thin layer of refrigeration oil (Ap-

plied on site).

•   When usual pipe sealing is used, refer to Table 1 for flaring of R410A refrigerant 

pipes.

  The size adjustment gauge can be used to confirm A measurements.

Table 1 (Fig. 4-2)

Copper pipe O.D. 

(mm)

A (mm)

Flare tool for R410A

Flare tool for R22·R407C

Clutch type

ø9.52 (3/8")

0 - 0.5

1.0 - 1.5

ø12.7 (1/2")

0 - 0.5

1.0 - 1.5

ø15.88 (5/8")

0 - 0.5

1.0 - 1.5

ø19.05 (3/4")

0 - 0.5

1.0 - 1.5

4.3. Refrigerant piping (Fig. 4-3)

Remove the service panel 

D

 (3 screws) and the front piping cover 

A

 (2 screws) and  

rear piping cover 

B

 (4 screws).

1

  Perform refrigerant piping connections for the indoor/outdoor unit when the out-

door unit’s stop valve is completely closed.

2

  Vacuum-purge air from the indoor unit and the connection piping.

3

  After connecting the refrigerant pipes, check the connected pipes and the indoor 

unit for gas leaks. (Refer to 4.4. Refrigerant pipe airtight testing method)

4

  A high-performance vacuum pump is used at the stop valve service port to main-

tain a vacuum for an adequate time (at least one hour after reaching –101 kPa (5 

Torr)) in order to vacuum dry the inside of the pipes. Always check the degree of 

vacuum at the gauge manifold. If there is any moisture left in the pipe, the degree 

of vacuum is sometimes not reached with short-time vacuum application. 

   After vacuum drying, completely open the stop valves (both liquid and gas) for the 

outdoor unit. This completely links the indoor and outdoor refrigerant circuits.

  •   If the vacuum drying is inadequate, air and water vapor remain in the refrigerant 

circuits and can cause abnormal rise of high pressure, abnormal drop of low 

pressure, deterioration of the refrigerating machine oil due to moisture, etc.

  •   If the stop valves are left closed and the unit is operated, the compressor and 

control valves will be damaged.

  •   Use a leak detector or soapy water to check for gas leaks at the pipe connec-

tion sections of the outdoor unit.

  •   Do not use the refrigerant from the unit to purge air from the refrigerant lines.

  •   After the valve work is completed, tighten the valve caps to the correct torque: 

20 to 25 N·m (200 to 250 kgf·cm).

     Failure to replace and tighten the caps may result in refrigerant leakage. In 

addition, do not damage the insides of the valve caps as they act as a seal to 

prevent refrigerant leakage.

5

  Use sealant to seal the ends of the thermal insulation around the pipe connection 

sections to prevent water from entering the thermal insulation.

A

 (Fig. 4-1)

Copper pipe O.D.

(mm)

Flare dimensions øA dimensions

(mm)

ø9.52

12.8 - 13.2

ø12.7

16.2 - 16.6

ø15.88

19.3 - 19.7

ø19.05

23.6 - 24.0

B

 (Fig. 4-1)

Copper pipe O.D.

(mm)

Flare nut O.D.

(mm)

Tightening torque

(N·m)

ø9.52

22

34 - 42

ø12.7

26

49 - 61

ø12.7

29

68 - 82

ø15.88

29

68 - 82

ø15.88

36

100 - 120

ø19.05

36

100 - 120

A

  Flare cutting dimensions

B

  Flare nut tightening torque

øA

45°± 2 °

R0.4~R0.8

90° ± 0.5°

A

B

C

D

A

  Die

B

  Copper pipe

Fig. 4-1

Fig. 4-2

4. Installing the refrigerant piping

Fig. 4-3

A

  Front piping cover

B

  Rear piping cover

C

  Stop valve

D

  Service panel

E

  Bend radius : 100 mm -150 mm

RG79Y933H01_EN.indd   6

2017/06/27   11:50:42

Summary of Contents for Mr.Slim PUHZ-P100VKA

Page 1: ...o correcto y seguro lea detalladamente este manual y el manual de instalación de la unidad interior antes de instalar la unidad de aire acondicionado MANUALE DI INSTALLAZIONE Per un uso sicuro e corretto leggere attentamente il presente manuale ed il manuale d installazione dell unità interna prima di installare il condizionatore d aria MANUAL DE INSTALAÇÃO Para uma utilização segura e correcta le...

Page 2: ...he unit electric shock or fire may result When installing or relocating or servicing the air conditioner use only the specified refrigerant R410A to charge the refrigerant lines Do not mix it with any other refrigerant and do not allow air to remain in the lines If air is mixed with the refrigerant then it can be the cause of abnormal high pressure in the refrigerant line and may result in an expl...

Page 3: ...tion The refrigerant pipes are hot or cold depending on the condition of the flowing refrigerant If you touch the pipes burns or frostbite may result After stopping operation be sure to wait at least five minutes before turn ing off the main power switch Otherwise water leakage or breakdown may result 1 5 Using R410A refrigerant air conditioners Caution Use C1220 copper phosphorus for copper and c...

Page 4: ...Air protection guide 3 Position the unit so that the air outlet blows perpendicularly to the seasonal wind direction if possible Fig 2 5 B Wind direction 2 4 2 When installing a single outdoor unit Refer to the last page Minimum dimensions are as follows except for Max meaning Maximum dimen sions indicated Refer to the figures for each case 1 Obstacles at rear only Fig 2 6 2 Obstacles at rear and ...

Page 5: ...with R410A refrigerant Use ester oil ether oil alkylbenzene oil small amount as the refrigeration oil applied to the flared sections Use C1220 copper phosphorus for copper and copper alloy seamless pipes to connect the refrigerant pipes Use refrigerant pipes with the thick nesses specified in the table to the below Make sure the insides of the pipes are clean and do not contain any harmful contami...

Page 6: ...o 4 4 Refrigerant pipe airtight testing method 4 A high performance vacuum pump is used at the stop valve service port to main tain a vacuum for an adequate time at least one hour after reaching 101 kPa 5 Torr in order to vacuum dry the inside of the pipes Always check the degree of vacuum at the gauge manifold If there is any moisture left in the pipe the degree of vacuum is sometimes not reached...

Page 7: ...the pipe inlet around the pipes so that no gaps remain If the gaps are not closed noise may be emitted or water and dust will enter the unit and breakdown may result Precautions when using the charge valve Fig 4 7 Do not tighten the service port too much when installing it otherwise the valve core could be deformed and become loose causing a gas leak After positioning section B in the desired dire...

Page 8: ...The existing pipe thickness does not meet specifications or the pipes are damaged 4 Installing the refrigerant piping P100 125 140 Drain socket PAC SG61DS E Drain pan PAC SH97DP E 5 Drainage piping work Outdoor unit drainage pipe connection When drain piping is necessary use the drain socket or the drain pan option 4 8 For twin triple combination Fig 4 8 When this unit is used as a FREE COMPO MULT...

Page 9: ...ch poles shall be provided Use earth leakage breaker NV Make sure that the current leakage breaker is one compatible with higher harmonics Always use a current leakage breaker that is compatible with higher harmonics as this unit is equipped with an inverter The use of an inadequate breaker can cause the incorrect operation of inverter 2 Max 45 m If 2 5 mm2 used Max 50 m If 2 5 mm2 used and S3 sep...

Page 10: ... SW4 2 OFF SW4 1 ON Heating operation SW4 2 ON After performing the test run set SW4 1 to OFF After power is supplied a small clicking noise may be heard from the inside of the outdoor unit The electronic expansion valve is opening and closing The unit is not faulty A few seconds after the compressor starts a clanging noise may be heard from the inside of the outdoor unit The noise is coming from ...

Page 11: ... minutes have passed If the refrigerant collecting operation has been completed normally LED1 off LED2 lit the unit will remain stopped until the power supply is turned off 4 Turn off the power supply circuit breaker Note that when the extension piping is very long with large refrigerant amount it may not be possible to perform a pump down operation When performing the pump down operation make sur...

Page 12: ...te Business Park Ballymount Dublin 24 Ireland Italian Branch Centro Direzionale Colleoni Palazzo Sirio Ingresso 1 Viale Colleoni 7 20864 Agrate Brianza MB Italy Norwegian Branch Gneisveien 2D 1914 Ytre Enebakk Norway Portuguese Branch Avda do Forte 10 2799 514 Carnaxide Lisbon Portugal Spanish Branch Carretera de Rubi 76 80 Apdo 420 08173 Sant Cugat del Valles Barcelona Spain Scandinavian Branch H...

Page 13: ...140EA R410A Standard Inverter Three Phase Product Information Sheet PSA RP100 140KA R410A Standard Inverter Product Information Sheet PUHZ P100 140V Y KA Parts List OCB670 PUHZ P100 140V Y KA Service Manual OCH670 PUHZ P100 140V YKA Installation Manual ...

Reviews: