8
PUZ-HA30NHA PUZ-HA36NHA
Unit : mm<inch>
Min. 1000mm
<39-3/8>
Min. 150mm
<5-29/32>
Min. 10mm
<3/8>
Min. 10mm
<3/8>
FREE
<Foundation bolt height>
FOUNDATION
Service space
Terminal Block Left···Power supply wiring
Right····Indoor/Outdoor wiring
Earth terminal
Service panel
Handle
1
2
23<29/32>
1076<42-3/8>
* 1 447<17-19/32>
* 1 443<17-7/16>
Handle
Front piping cover
Rear piping cover
Air Discharge
Rear Air Intake
Side Air Intake
31<1-7/32>
145
<5-23/32>
145
<5-23/32>
220
<8-21/32>
30<1-3/16>
145
<5-23/32>
81<3-3/16>
219<8-5/8>
71<2-13/16>
71<2-13/16>
Bottom piping hole (Knockout)
Drain hole 5-
:
33<1-5/16>
Handle
Side Air Intake
Air intake
Rear Air Intake
Handle
Handle
40<1-9/16>
74<2-19/32>
When installing the conduit. Set the attachment to the inner side of each panel.
2-
:
22.2<7/8>
1/2 Conduit attachment
45<1-25/32>
40<1-9/16>
65<2-9/16>
92<3-5/8>
27<1-1/16>
55<2-3/16>
23<29/32>
73<2-7/8>
63<2-1/2>
Rear piping hole
(Knockout)
Rear trunking hole (Knockout)
Conduit hole (2-
:
27<1-1/16>Knockout)
:
92
<3-5/8>
19<3/4>
55<2-3/16>
92<3-5/8>
75
<2-31/32>
40<1-9/16>
73<2-7/8>
63<2-1/2>
23<29/32>
27<1-1/16>
92<3-5/8>
Right piping hole (Knockout)
Right trunking hole (Knockout)
Conduit hole (2-
:
27<1-1/16>Knockout)
:
92
<3-5
/8>
92<3-5/8>
65<2-9/16>
45<1-25/32>
40<1-9/16>
27<1-1/16>
55<2-3/16>
23<29/32>
73<2-7/8>
63
<2-1/2>
Front piping hole (Knockout)
Front trunking hole (Knockout)
Conduit hole (2-
:
27<1-1/16>Knockout)
:
92
<3-5
/8>
371<14-19/32>
330<13>
30<1-3/16>
175<6-7/8>
600<23-5/8>
175<6-7/8>
42<1-21/32>
66<2-5/8>
950<37-13/32>
322<12-11/16>
1350<53-5/32>
635<25>
19<3/4>
417<16-13/32>
370<14-9/16>
2-U Shaped notched hole (Foundation Bolt M10<W3/8>)
56<2-7/32>
28<1-3/32>
53<2-3/32>
45<1-25/32>
2-12
%
36 Oval hole
(Foundation Bolt M10<W3/8>)
····Refrigerant GAS pipe connction (FLARE)
:
15.88<5/8>
····Refrigerant LIQUID pipe connection (FLARE)
:
9.52<3/8>
*1 ····Indication of STOP VALVE connection location.
Example of Notes
1 FREE SPACE (Around the unit)
2 SERVICE SPACE
3 FOUNDATION BOLTS
4 PIPING-WIRING DIRECTIONS
Piping Knockout Hole Details
The diagram below shows a basic example. Explantion of particular details are given in the installation manuals etc.
Dimensions of space needed for service access are shown in the below diagram.
Please secure the unit firmly with 4 foundation (M10<W3/8>) bolts. (Bolts and washers must be purchased locally.)
Piping and wiring connections can be made from 4 directions: front, right, rear and below.
Min. 10mm<3/8>
Min.
500mm
<19-11/16>
Min. 500mm <19-11/16>
Min.
150mm
<5-29/32>
Min.
30mm
<1-3/16>