
10
3. Selecting an inst
allation site & Accessories
•S
elect
a sit
e w
ith
sturd
y fixed
surface suf
fic
ient
ly dura
ble against
the wei
ght of
unit.
•B
efore i
nst
alling
unit, the r
outing to
carry in un
it to the inst
allation site s
hould b
e
determin
ed.
•S
elect
a sit
e where the uni
t is n
ot affected
b
y ent
ering air
.
•S
elect
a sit
e where
the f
low
of s
upply and
retu
rn air is n
ot blocked
.
•S
elect
a sit
e where re
frigera
nt pipi
ng can easily be led to
th
e ou
tside.
•S
elect
a sit
e which allows the
supply
air to
be
di
strib
uted ful
ly in roo
m.
•D
o n
ot in
stall unit
at a site wit
h oil splashing
or st
eam in much quanti
ty.
•D
o n
ot in
stall unit
at a site whe
re co
mbustible gas may
gener
ate, fl
ow in
, stagn
ate
or leak.
•D
o not i
nst
all unit
at a
site where
equipment
genera
tin
g high f
requency waves (
a
high frequ
ency wave weld
er for
exa
mple) is p
rovided.
•D
o not inst
all unit at
a site whe
re fi
re detecto
r is lo
cated
a
t the suppl
y air sid
e. (Fire
detecto
r may operat
e errone
ously due t
o t
he heat
ed air suppl
ied during
heatin
g
operati
on.)
•A
void place
s wher
e acidic sol
utions
are fr
equently han
dled.
•A
void place
s wher
e sulphur
-based or ot
her
sprays are
fr
equent
ly u
se
d.
•W
hen sp
ecial chemical prod
uct may scat
te
r aro
und such as
site che
mica
l pla
nts
and hospit
als,
full invest
igation is re
quired bef
ore inst
alling unit
.
(T
he plast
ic
compone
nts
may be
da
maged de
pending on t
he chemical prod
uct applied.
)
•I
f th
e un
it is ru
n fo
r lon
g h
ours when
the a
ir
above th
e ceiling
is at high
te
mperatu
re/
high hu
midity (du
e point above 26 °C [7
9 °F
]), due cond
ensation may
be
produ
ced
in the indoo
r unit. Wh
en operati
ng the unit
s in t
his condit
ion,
add in
sulat
ion mat
erial
(10-20 mm [
13/32 t
o 13/1
6 in]) t
o the en
tire surf
ace of th
e indoor un
it to a
vo
id du
e
conden
satio
n.
3.1
. Inst
all th
e indoor unit
o
n a ceilin
g str
ong enough
to
sus
tain
its we
igh
t
Warni
ng
:
The unit must be
secure
ly
in
stal
led
o
n a
stru
cture that c
an susta
in i
ts we
ight. If
the unit is mounted on an u
nst
able
structure,
it may fall do
wn causing inju
ries.
3.2
. Secu
ring inst
allat
ion and s
ervic
e spac
e
Secu
re enoug
h access space t
o allow f
or the
maintena
nce, inspect
ion,
and
replacemen
t of t
he moto
r, fan
, d
rain
pump, hea
t excha
nger, an
d elect
ric bo
x in on
e
of the follo
wing ways.
Select an
inst
allatio
n sit
e for
the
ind
oor unit so
that
its maintena
nce access sp
ace wil
l
not be obst
ructed by
beams
or
oth
er obje
cts
.
(1)When a
space o
f 300
mm [11
-13/16
in] o
r more is
available b
elow t
he uni
t
between
the unit
and the ceiling
(Fig
. 3-2-1)
•C
reat
e access
door 1
and 2
(450
× 450
mm [17-
3/4 ×
17-3/4
in] each)
as shown
in Fig.
3-2-2.
(A
ccess
door 2 i
s not
require
d if e
nough sp
ace is
available b
elow
the un
it for a
maint
enance
wor
ke
r t
o work in.)
(2)When a sp
ace of less t
han 300 mm [
11-13
/16 in]
is available bel
ow the uni
t
between
the un
it and th
e ceiling (A
t least 20 mm [
13/16 in]
of sp
ace should be lef
t
below
the
unit as sho
wn
in Fig
. 3-2-
3.)
•C
reat
e access door 1
diagonally
below the
elect
ric box and
access door
3 below
the un
it as sho
wn
in
Fig. 3-2
-4.
or
•C
reat
e access doo
r 4 below
the el
ectric
box an
d the unit
as sho
wn in Fig.
3
-2-5
.
[Fig.3
-2-1]
(P .2)
[Fig.3
-2-2] (Vi
ewed from the d
irecti
on of the arro
w A)
(P
.2)
[Fig.3
-2-3]
(P .2)
[Fig.3
-2-4] (Vi
ewed from the d
irecti
on of the arro
w B)
(P
.2)
[Fig.3
-2-5] (Vi
ewed from the d
irecti
on of the arro
w B)
(P
.2)
3.3. Indo
or unit acce
ssorie
s
Th
e u
nit
is provid
ed with the f
ollowin
g accessories:
4. Fixing hanging bolt
s
4.1
. Fixing ha
nging bolts
[Fig
.4
-1-1
](
P .3)
(Give sit
e of suspe
nsion strong stru
cture
.)
Hang
in
g struc
tur
e
•C
eiling: The
ce
iling structure varies fro
m building to on
e anothe
r. For de
taile
d
info
rmation
, consult
your con
stru
ction
company
.
•I
f necessa
ry,
reinfo
rce the h
anging bol
ts with
anti-qu
ake support
ing me
mbers as
counter
measures against ear
thquakes.
*U
se M10 for han
ging bolts and ant
i-quake su
pportin
g me
mbers (field suppl
y).
1
Reinfo
rcing t
he ceiling
with a
ddition
al members (
edge bea
m, et
c.)
must be
required
to ke
ep the
ceiling at
level and t
o p
revent
the ceil
ing from
vibrat
ions.
2
Cut an
d remove the cei
ling members.
3
Reinfo
rce the ce
iling members, and add
ot
her
members
fo
r fixing th
e ceil
ing
boards.
Center of g
rav
ity
and Prod
uct We
ight
5. Installing
the
unit
5.1
. Hanging t
he unit
b
ody
Bring the i
ndoor uni
t to an i
nstallation
site as
it i
s pack
ed.
To hang the indoor unit, use a
lifting mach
ine to lift and pass t
hrough
the
hanging bol
ts.
[Fig
.5
-1-1
](
P .3)
[Fig
.5
-1-2
](
P .3)
5.2. Conf
irming the
u
nit’s
posit
ion and f
ix
ing han
ging
bolt
s
Ensure
that the ha
ng
ing
bolt nuts ar
e tig
htened
to fix the ha
nging
bolts
.
To ensur
e that
drai
n is
discha
rged,
be sur
e to hang
the unit at le
vel usi
ng
a
level
.
Caution:
Insta
ll the unit i
n horizontal posi
tion. I
f t
he side w
ith dr
ain port i
s i
nst
alled
higher
, wat
er
leak
age m
ay be caused.
A
Elec
tric bo
x
B
Ceilin
g
C
Ceilin
g bea
m
D
Access d
oor 2
(450 mm
×
450
mm [17-
3/4 i
n
×
17-3
/4 in])
E
Access d
oor 1
(450 mm
×
450
mm [17-
3/4 i
n
×
17-3
/4 in])
F
Mainten
ance
access sp
ace
G
Supp
ly ai
r
H
Inta
ke air
I
Botto
m of
indo
or u
nit
J
Access d
oor 3
K
Access d
oor
4
No.
Name
Qua
ntity
1
Pipe cover (f
or refrig
erant pipin
g joint
) Small di
ameter
1
2
Pipe cover (f
or refrig
erant pipin
g joint
) Large
diamet
er
1
3
Bands f
or te
mp
orary t
ight
ening of pip
e co
ver
and drain
h
ose
8
4
Washer
(square)
8
5
Drain
hose
2
6
Washer
(round
)
2
7
Installat
ion man
ual
1
8
Operat
ion manual
1
A
Cent
er of
gravi
ty
Model name
W mm
[in]
L mm [in]
X mm [in]
Y mm [
in]
Z mm [
in]
Product W
eight
kg [l
b]
PEAD-A
09AA7
643
[25
-5/
16]
954 [37-9
/16
]
340 [13-
3/8]
375 [1
4-3/4]
130 [5-1/
8]
26 [58]
PEAD-A
12AA7
643
[25
-5/
16]
954 [37-9
/16
]
340 [13-
3/8]
375 [1
4-3/4]
130 [5-1/
8]
26 [58]
PEAD-A
15AA7
643
[25
-5/
16]
954 [37-9
/16
]
340 [13-
3/8]
375 [1
4-3/4]
130 [5-1/
8]
28 [62]
PEAD-A
18AA7
643
[25
-5/
16]
954 [37-9
/16
]
340 [13-
3/8]
375 [1
4-3/4]
130 [5-1/
8]
28 [62]
PEAD-A
24AA7
643
[25
-5/
16]
1154 [
45-7/16
]
325 [
12-13/
16]
525 [20-
11/1
6]
130 [5-1/
8]
31 [69]
PEAD-A
30AA7
643
[25
-5/
16]
1154 [
45-7/16
]
325 [
12-13/
16]
525 [20-
11/1
6]
130 [5-1/
8]
31 [69]
PEAD-A
36AA7
643 [
25-5/
16]
1454 [57-
1/4]
330 [13]
675 [26-9
/1
6]
130 [5-1/
8]
39 [86]
PEAD-A
42AA7
643 [
25-5/
16]
1454 [57-
1/4]
330 [13]
675 [26-9
/1
6]
130 [5-1/
8]
41 [91]
A
Unit bo
dy
B
Lifti
ng machi
ne
C
Nuts
(field
supply)
D
Wash
ers (accessory)
E
M10
hangi
ng b
olt (
fiel
d sup
ply)
KJ79F751
H03.book
10 ペー
ジ 20
17年4
月25日
火曜日
午後12
時2分