29
CHAPTER 4 PROCEDURES BEFORE OPERATION
4
CHAPTER 4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operating the head module.
For start-up examples, refer to the user's manual for the Motion controller used.
Page 31, CHAPTER 5,
Page 65, CHAPTER 8
Page 35, Section 6.1,
Page 36, Section 6.2,
Page 44, Section 6.3
Page 53, CHAPTER 7,
Page 65, CHAPTER 8
Page 20, CHAPTER 2,
Page 65, CHAPTER 8
Checkbox
Consider the system configuration and link device assignment.
System consideration
Installation
Install the power supply module, head module, I/O module(s),
intelligent function module(s), and an END cover.
Unit test
Perform unit tests on the head module and intelligent function module(s).
Connection
Connect an SSCNET III cable to the head module.
Set parameters for each module.
Configuration
Starting data link
Start data link.
Summary of Contents for MELSEC-L SSCNETIII/H
Page 1: ...MELSEC L SSCNET H Head Module User s Manual LJ72MS15 ...
Page 2: ......
Page 11: ...9 Memo ...
Page 17: ...15 Memo ...
Page 21: ...19 CHAPTER 1 HEAD MODULE 1 Memo ...
Page 30: ...28 Memo ...
Page 36: ...34 Memo ...
Page 54: ...52 Memo ...
Page 78: ...76 Memo ...
Page 82: ...80 Memo ...
Page 102: ...100 Memo ...
Page 106: ...104 Memo ...
Page 110: ...108 Memo ...
Page 112: ...110 Memo ...
Page 114: ...112 Memo ...
Page 125: ...123 APPENDICES A Appendix 7 Special Register SD List Memo ...
Page 137: ...135 APPENDICES A Appendix 9 General Safety Requirements Memo ...
Page 141: ...139 APPENDICES A Appendix 11 Processing Time Memo ...
Page 145: ...143 APPENDICES A Appendix 12 Checking Serial Number and Function Version Memo ...
Page 147: ...145 APPENDICES A Appendix 13 External Dimensions Memo ...
Page 153: ......