Checkpoint
Action
9
8
7
Do the signal cables meet regulations? (Type, diameter)
1
No.
2
Is the signal cable wired at least 5 cm away from the power supply
cable?
3
Are multiple transmission or signal cables wired to the same power
cable duct?
4
Are multiple signal cables wired with multi core cables?
5
Are the signal cables securely connected to the terminals?
6
Are the signal cables connected to the speci
fi
ed terminal blocks?
Operation monitor, operation monitor with delay function 1: TM4 ,
Malfunction monitor
: TM3 ,
Bypass operation monitor, operation monitor with delay function 2 : TM3 ,
Are the output capacities of the operation monitor, malfunction moni-
tor, and bypass operation monitor within the ratings?
Use speci
fi
ed cables.
Wire the signal cable at least 5
cm away from the power supply
cable.
Wire the transmission cables
away from the signal cables.
Using suitable cables, wire the
signal cables so that they are
separated from one another.
Connect them securely.
Connect them to the speci
fi
ed
terminal blocks.
Use them within the ratings.
Signal cables to external devices (Table 1-1-4)
Check the following checkpoints when outputting the operation monitor, air supply fan operation monitor, mal-
function monitor, bypass operation monitor, and operation monitor with delay function.
When the operation monitor is used, is the setting of the output signal
correct?
<When using PZ-60DR-E>
Check the operation monitor set-
ting from the function selection.
(Refer to page 28)
<When not using PZ-60DR-E>
Check the setting of the operation
monitor (SW5-2) on the Lossnay
circuit board. (Refer to page 25)
When the operation monitor is used with delay function , is the setting
of the output signal correct?
Check the settings of the TM4 ,
output setting (SW2-8), and the
TM3 , output setting (SW5-6)
on the Lossnay circuit board.
(Refer to page 25)
10
When PZ-60DR-E is not used, are the function selection switches
(SW2, SW5) on the Lossnay circuit board set correctly?
Set the switches correctly to cor-
respond with the application.
(Refer to page 25 and 26)
11
When PZ-60DR-E is used, is the function selection set correctly?
Set it correctly to correspond with
the application.
(Refer to page 27 to 29)
Output
Maximum rating
Minimum rating
Operation monitor
Operation monitor with delay function 1
240 V AC 2 A
24 V DC 2 A
220 V AC 100 mA
5 V DC 100 mA
Malfunction monitor
240 V AC 1 A
24 V DC 1 A
220 V AC 100 mA
5 V DC 100 mA
Bypass operation monitor
Operation monitor with delay function 2
240 V AC 1 A
24 V DC 1 A
220 V AC 100 mA
5 V DC 100 mA