─
33
─
8
Connect them to the speci
fi
ed
terminal blocks.
2
7
Is the main power supply on?
Checkpoint
1
No.
2
Do the main power supply switching capacity and wiring diameter
meet speci
fi
cation?
3
Is the speci
fi
ed power supply of 230 V AC connected to the power
supply terminal (TM1)?
4
Has the fuse (FUSE 1) on the circuit board blown?
5
Are connector (CN1) of the transformer primary and connector (CN2)
of the transformer secondary on the circuit board securely connected?
6
Is the power supply wiring incorrectly wired, or is there a faulty connection?
Is power display LED4 (red) on the circuit board unlit?
7-2 Checklists
(1) Troubleshooting 1: The system will not start properly.
Initialization checklist from installation to operation (Table 1-1)
After checking the system, verify the checkpoints listed below.
Action
Turn on the main power supply.
Use speci
fi
ed items.
Connect the speci
fi
ed power sup-
ply.
Replace the circuit board.
Connect them securely.
Make secure connections.
Check the above checkpoints.
Power supply (Table 1-1-1)
Do the transmission cables meet regulations? (Type, diameter)
Checkpoint
1
No.
Is the transmission cable wired at least 5 cm away from the power
supply cable?
3
Are multiple transmission or signal cables wired to the same power
cable duct?
4
Are multiple transmission cables wired with multi core cables?
5
Are the transmission cables securely connected to the terminals?
6
Are the transmission cables connected to the speci
fi
ed terminal
blocks?
Basic system (PZ-60DR-E, PZ-41SLB-E): TM4 ,
M-NET control: TAB5
A
,
B
7
Is the wiring length of the transmission cable within the regulations?
Basic system (PZ-60DR-E, PZ-41SLB-E): Total extension within 500
m
M-NET control: Maximum extension within 200 m, total extension
within 500 m
Action
Use speci
fi
ed cables.
Wire the transmission cable at
least 5 cm away from the power
supply cable.
Wire the transmission cables
away from the signal cables.
Using suitable cables, wire the
transmission cables so that they
are separated from one another.
Connect them securely.
Wire the cables within the regula-
tions. (See the technical manual
for details about the regulations.)
Transmission cables (Table 1-1-2)
Check the following checkpoints when connecting with the remote controller, M-NET controller, or City Multi indoor units.
Is the Main/Sub selection switch (SW1) on the Lossnay circuit board
set correctly?
When using one Lossnay unit: Set the unit to “Main”.
When using multiple Lossnay units: Set the
fi
rst unit to “Main” and
the second and following units
to “Sub”.
Set the switches correctly.
9
When using M-NET
Is the address setting on the Lossnay circuit board (SA1, SA2) set to
the correct number?
Make the setting so that the ad-
dress does not duplicate that of
other devices within M-NET control.
10
When PZ-60DR-E is not used, are the function selection switches
(SW2, SW5) on the Lossnay circuit board set correctly?
Set the switches correctly to cor-
respond with the application.
(Refer to page 25 and 26)
11
When PZ-60DR-E is used, is the function selection set correctly?
Set it correctly to correspond with
the application.
(Refer to page 27 to 29)