![Mitsubishi Electric FX3U-1PG User Manual Download Page 103](http://html.mh-extra.com/html/mitsubishi-electric/fx3u-1pg/fx3u-1pg_user-manual_238960103.webp)
9 Positioning Control
9.4 2-speed Positioning Operation
97
FX
3U
-1PG User's Manual
1
Introduc
tion
2
Speci
ficati
on
3
Sy
stem
Configurati
on
4
Ins
tallati
on
5
Wi
rin
g
6
Be
fore Starti
ng
Po
sition
ing
Operation
7
Buf
fer M
emory
8
Man
ual
C
ontrol
9
Posi
tioni
ng
Co
ntrol
10
Program
Ex
ampl
e
Caution of the 2-speed positioning operation
• Operation when the 1-speed travel amount is small
- When the time required to accelerate to the operation speed I < the travel time to target address I
The operation accelerates until reaching target address I
- When the 1-speed travel amount is 0
When the 1-speed travel amount is 0, the operation starts with operation speed II and decelerates and
stops at the target address II. The 1-speed completion flag turns on at the startup of the operation and
turns off when the positioning completes.
• Operation when the 2-speed travel amount is small
- When the time required to decelerate from operation speed I > the travel time to target address II
The deceleration starts after the 1-speed completion and stops when target address II is reached.
#22, #21
Target address ΙΙ
#24, #23
Operation speed ΙΙ
#25 b10
Operation command
2-speed positioning operation start
#54, #53
Target address change value
#56, #55
Operation speed change value
BFM No.
Setting items
Positioning
parameter
Extension
positioning
parameter
Operation speed II
Target address II
Speed
Operation speed I
Time required for acceleration
Time
Travel time
Target address I
Speed
Target address II
Operation speed I
Time required for deceleration
Operation speed II
Time
Travel time
Summary of Contents for FX3U-1PG
Page 1: ...FX3U 1PG USER S MANUAL ...
Page 2: ......
Page 6: ...Safety Precautions Read these precautions before use 4 MEMO ...
Page 145: ......