6.3. Check of drainage (Fig. 6-3)
• During the trial run, ensure the water is being properly drained out and that no water
is leaking from joints.
• Always check this during installation even if the unit is not required to provide cool-
ing/drying at that time.
• Similarly, check the drainage before finishing ceiling installation in a new premises.
(1) Remove the cover of the water supply inlet and add about 1000 cc of water using
a water supply pump etc. During this process, be careful not to spray water into
the drain pump mechanism.
(2) Confirm that water is being drained out through the drainage outlet, after switching
over from remote control mode to trial run mode.
(3) After checking the drainage, ensure that the cover is replaced and the power
supply is isolated.
(4) After confirming the drainage system is functioning, replace the drain plug.
Fig. 6-3
A
Insert the pump end 3 to 5 cm
B
Cover of water supply inlet
C
About 1000 cc
D
Water
E
Drain plug
Fig. 6-2
6.2. Test run
The following 3 methods are available.
6.2.1. Using wired remote controller (Fig. 6-1)
1
Turn on the power at least 12 hours before the test run.
2
Press the [TEST] button twice.
➡
“TEST RUN” liquid crystal display
3
Press the [Mode selection] button.
➡
Make sure that wind is blown out.
4
Press the [Mode selection] button and switch to the cooling (or heating) mode.
➡
Make sure that cold (or warm) wind is blown out.
5
Press the [Fan speed] button.
➡
Make sure that the wind speed is switched.
6
Check operation of the outdoor unit fan.
7
Release test run by pressing the [ON/OFF] button.
➡
Stop
8
Register a telephone number.
The telephone number of the repair shop, sales office, etc., to contact if an error
occurs can be registered in the remote controller. The telephone number will be
displayed when an error occurs. For registration procedures, refer to the operation
manual for the indoor unit.
6.2.2. Using wireless remote controller (Fig. 6-2)
1
Turn on the power to the unit at least 12 hours before the test run.
2
Press the
button twice continuously.
(Start this operation from the status of remote controller display turned off.)
A
and current operation mode are displayed.
3
Press the
button to activate
mode, then check whether
cool air is blown out from the unit.
4
Press the
button to activate
mode, then check whether
warm air is blown out from the unit.
5
Press the
button and check whether fan speed changes.
6
Press the
button and check whether the auto vane operates properly.
7
Press the ON/OFF button to stop the test run.
Note:
• Point the remote controller towards the indoor unit receiver while following
steps
2
to
7
.
• It is not possible to run the in FAN, DRY or AUTO mode.
6. Test run
A
ON/OFF button
B
Test run display
C
Indoor temperature liquid line
temperature display
D
ON/OFF lamp
E
Power display
F
Error code display
Test run remaining time display
G
Set temperature button
H
Mode selection button
I
Fan speed button
M
TEST button
Fig. 6-1
6.1. Before test run
►
After completing installation and the wiring and piping of the indoor and
outdoor units, check for refrigerant leakage, looseness in the power supply
or control wiring, wrong polarity, and no disconnection of one phase in the
supply.
►
Use a 500-volt megohmmeter to check that the resistance between the power
supply terminals and ground is at least 1.0 M
Ω
.
►
Do not carry out this test on the control wiring (low voltage circuit) termi-
nals.
Warning:
Do not use the air conditioner if the insulation resistance is less than 1.0 M
Ω
.
°C
°C
SIMPLE
PAR-21MAA
ON/OFF
FILTER
CHECK
OPERATION
CLEAR
TEST
TEMP.
MENU
BACK
DAY
MONITOR/SET
CLOCK
ON/OFF
TEST RUN
COOL, HEAT
Summary of Contents for CITY MULTI PLFY-P25-40VCM-E
Page 102: ...102 ...
Page 103: ...103 ...