39
OCH728A
Be careful when removing heavy parts.
OPERATING PROCEDURE
PHOTOS/FIGURES
6.
Removing the electrical box
(1) Remove the electrical box cover (See Photo 1 and 2)
and the connectors (Refer to procedure 5).
(2) Remove the electrical box fixing screws (M5×10: 2
screw). (See Photo 3)
<Electrical parts in the electrical box>
• Terminal block for earth and reactor
• Indoor controller board
• Thermistor (TH)
(3) Remove the electrical box (2 hooks).
Photo 6
Photo 7
< Nut and washer >
Photo 9
7.
Removing the turbo fan
(1) Remove the electrical box. (See Photo 3 and refer to
procedure 6)
(2) Remove the bell mouth (tapping screw 4×10: 2 screws).
(See Photo 6)
(3) Remove the nut (M8 × 1) and a washer.
(See Photo 7 and 8.)
(4) Remove the turbo fan.
Note 1:
When assembling the turbo fan, attach it so that
its tabs fit the holes of washer.
Note 2:
Nut tightening torque: 4.5 ± 0.5 Nm.
Photo 8
Electrical box
Bell mouth fixing screws
Bell mouth
Turbo fan
Nut and washer
Turn this way to tighten.
Turn this way to loosen.
(The same directions as the fan rotation.)
Hooks
Washer
Turbo fan
tabs
holes