5. PROCEDURES BEFORE SYSTEM OPERATION
MELSEC-A
5-1
5. PROCEDURES BEFORE SYSTEM
OPERATION
5.1
Procedures before Operation
The procedure for newly connecting AJ71PB96F/A1SJ71PB96F to an existing PROFIBUS-FMS
network is explained below.
Install the AJ71PB96F/A1SJ71PB96F in the PC base unit.
Connect the AJ71PB96F/A1SJ71PB96F and the network
with a twisted pair cable.
This is a hardware error, so contact the
nearest Mitsubishi Electric dealer and
explain the symptoms to the dealer.
Put the AJ71PB96F/A1SJ71PB96F in self-diagnosis mode
and turn onthe PC power supply to conduct a self-diagnosis
of the AJ71PB96F/A1SJ71PB96F. (refer to Section 5.4.)
Startup
Turn the PC CPU key switch to stop.
Set the AJ71PB96F/A1SJ71PB96F to the parameter setting mode.
Reset the PC CPU and set the AJ71PB96F/A1SJ71PB96F
parameter. When setting the SW0IX-PR0FPE is required.
Set the AJ71PB96F/A1SJ71PB96F in online mode
and reset the PC CPU.
Establish a connection between the AJ71PB96F/
A1SJ71PB96F and the partner station using the
SW0IX-PROFPE and acquire the partner station OD.
At this time, the acquired OD information is not stored
in the AJ71PB96F/A1SJ71PB96F, so be careful.
No
No
Yes
Yes
No
Yes
* Parameter
Is parameter* setting required?
Acquire the
partner station OD information
online?
Bus parameter
CRL information
Local OD
Is the AJ71PB96F/
A1SJ71PB96F normal?