LS700BS 7 Ton Petrol Logsplitter
7
Original Instructions Version April 13
CONTENTS OF THE CONTAINER
A. Log Splitter Frame …………................................1 set
B. Control Lever and Guard Assy................................2sets
C. Removable Support Table....…...............................1 pc
D. Owner’s Manual ……….....…….….....................1 pc
E. Cross Splitter ……….....…….….............................1 pc
SET UP AND PREPARATION FOR OPERATION
1. Pull Spring Pin (A) to remove the Lock Pin (B). Apply a thin coat of grease to both surfaces of the Control Lever Guard as illustrated.
Insert the Control Lever and Guard Assy and make sure the Control Lever End goes into the slot of Connection Bracket (C). Lock
the Control Lever and Guard Assy down with the Lock Pin (B) and Spring Pin (A). Follow the same steps to install the other Control
Lever and Guard Assy on the other side.
2. 3 installation positions are available for the Support Table for different splitting lengths. At every installation position, Lock Down
Hooks (D) are available. Insert the Support Table in the selected Brackets (E). Turn the Lock Down Hooks (D) on both sides by 90
degrees to lock the Support Table down.
A
E