14
INSTALLATION
Plumbing Connection
1.1
Unscrew the Case Securing Screw
and carefully pull the bottom of the
Cover outwards and upwards off the
Case.
1.2
Remove the Inlet Shield, located over
the Inlet Connector Assembly.
1.3
When deciding the position of the
Mira Advance ATL on the wall, allow
100 mm minimum clearance to
the right hand side of the case, to
provide unrestricted access to the
inlet connector, for installation and
maintenance. Allow 10 mm minimum
clearance from the top of the case to
allow the cover to be removed.
1.4
Determine whether the cold water
and cable supplies will be top (falling),
bottom (rising), or rear inlet to the
Mira Advance ATL. Provision must be
made for routing the signal cable from
the appliance to the Shower Drain
pump (up to 2 m), this applies to the
Standard Extra and Flex Extra models
only.
Note!
Rear inlet must allow access to
the water supply pipe fi ttings.
Refer to section:
"Important Safety Information"
fi rst.
This installation covers all models of the Mira Advance ATL Thermostatic
shower.
Warning!
Isolate the electrical and water supplies before proceeding with the
installation of the Mira Advance ATL. The electricity supply must be turned off at the
mains and the appropriate circuit fuse removed, if applicable.
Note!
Bottom inlet is illustrated for clarity in these instructions.
Case Securing
Screw
13-Way
Multi-Connector
Inlet Shield
Transit
Sealing Cap
(outlet)