
22
1.20. Connect the wire 78 multi-connector
lead from the relay board, in the
Mira Advance ATL, to the socket
on the control PCB located in the
cover. The multi-connector is a
one way fit into the receiving socket
on the control PCB. Ensure that
the multi-connector is correctly
orientated as illustrated.
Ensure that the connector is fully
pushed home.
1.21. Refit the cover by locating the top
of the cover onto the location strip
on the top of the case. Ensure that
the wire 78 multi-connector lead is
seated between the tank body and
the left- hand side of the case.
1.22. Push the bottom of the cover
against the case until it locates
correctly.
Install the screw and tighten.
1.23. Install the shower fittings, refer to
the separate Installation, Operation
and Maintenance Guide.
1.24. The high capacity spray plate
illustrated in the shower fitting guide
is not supplied with this Mira
Advance ATL.
1.25. Now proceed to commission the
Mira Advance. Refer to Section
9, "Commissioning".
Connector Clamps
Ensure That The Connector
Is Fully Pushed Home
Summary of Contents for Advance ATL
Page 48: ...48 SpareParts ...
Page 55: ...55 Notes ...