background image

MILPOWER SOURCE                                                     

110BA1UM, REV(B)

12

Charge-discharge Cycles
The number of times and the depth of battery discharges (during AC input failure) affects the
service life of the battery.

If the battery is allowed to discharge only to 50% of its charge, the number of charge-discharge
cycles (before it fails) will be three times the number of cycles had it been allowed to reach 30%
charge.

Battery life may be prolonged by limiting the operating time on battery power to the minimum
required by the system to perform an orderly shutdown.

7.2 

Replacing the Battery Pack

For ease of use, the battery of the M110BA-1 is packaged within a Removable Battery Pack (MPS
P/N M357380) that may be ordered separately.
During storage, the Battery Pack may be removed and stored separately in a cooled ambient.

To remove the Battery Pack from the UPS:

a)

Turn OFF the Master ON/OFF switches.

b)

Disconnect J1 and J2 from the rear panel.

c)

Open seven screws on the battery’s rear cover.

d)

Open the Battery Connector access cover.  Remove screws.

e)

Disconnect the connector by pulling upward.

f)

Unscrew the right battery’s screws on the top and three screws on the right side
of the UPS (marked by a B” on the top and recessed on the side).

g)

Hold the Battery Pack by the two edges on the sides (Caution: Two-man lift !!) and 
lift it straight up.

To install a new battery:

a)

Lower the Battery Pack straight into its place (at the right side of the UPS). Verify that
the battery mating connector and harness (near the front panel) are not
damaged by the battery.

b)

Install the screws on the top and the right side without tightening them yet.  After all
screws are in, torque them at 11 IN.LB for the #6 top screws and 22 IN.LB for the #8
side screws.     Note: Suitable locking compound (Locktite 242, or similar) should be
applied to all screws.

c)

Connect the battery connector.

d)

Close the battery connector cover and tighten its screws (6.5 IN.LB).

e)

Close the battery’s rear cover and tighten its screws (6.5 IN.LB).

f)

Reconnect J1 and J2 to the rear panel.

The unit is now ready for operation.

Note: If the new battery is fully charged, press the Set-Battery-Charge-to-100%

Push-Button for  ten seconds to set the charge level to full scale.

Summary of Contents for M110BA-1

Page 1: ...IN THE U S A USER S MANUAL East Coast Milpower Source 7 Field Lane RTE 106 Belmont NH 03220 Phone 603 267 8865 Fax 603 267 7258 West Coast Hytech Associates 1498 Linda Vista Ave Pasadena CA 91103 Pho...

Page 2: ...st 11 7 Taking Care of the Battery 11 7 1 Battery Service Life 11 7 2 Replacing the Battery Pack 12 8 Communications and Remote Control 13 8 1 Dry Contacts Interface 13 8 1 1 Option 0 Standard Dry Con...

Page 3: ...ched off by the Input ON OFF Switch The unit should only be plugged into an approved double pole and fused 20A electrical outlet for 230VAC input use 15 AMP fuses The Replaceable Battery Pack of the M...

Page 4: ...le Battery Pack a Battery Charger a DC AC Inverter and a microcontroller based Control Circuit The AC DC Converter is a high frequency switching converter that provides 320VDC to the DC AC inverter Th...

Page 5: ...VARISTOR AC DC CONVERTER DC AC INVERTER CONTROL MONITOR BATTERY CHARGER BATTERY PACK 24VDC 24VRTN INPUT ON OFF SWITCH MASTER ON OFF SWITCH REMOTE ON OFF SWITCH 2 POLES INPUT CONTACTOR 2 POLES OUTPUT...

Page 6: ...inning of this manual Make sure that the input voltage setting is correct Make sure that the Master switch is in the OFF position Two circular connectors J1 and J2 are provided on the rear panel of th...

Page 7: ...1 PWR COND OUT 1 PWR COND OUT 2 UPS OUT 1 NEUT UPS OUT 2 HOT 115VAC VIA TWO POLE CIRCUIT BREAKER AC TO LOAD BYPASS SELECTOR NOTE 2 GND CHASSIS G E C D A B F UPS NOTE 3 SAFETY GND REAR PANEL GND CONN...

Page 8: ...A J1 PWR COND INPUT PHASE 2 PWR COND INPUT PHASE 1 CHASSIS GND UPS OUT 1 NEUT UPS OUT 2 HOT 115VAC VIA TWO POLE CIRCUIT BREAKER GND CHASSIS G E C D A B F UPS NOTE 2 SAFETY GND REAR PANEL GND CONN NOTE...

Page 9: ...el Main Components See Figure 4 1 Removable air filter of the Power Conditioner s cooling air 2 Visual Indicators and Switches for detailed view see Figure 5 3 Air Inlet of main UPS heatsink 4 Input O...

Page 10: ...2 Alarm Off Push button 13 Low Battery Warning LED blinking yellow 14 Overload Shutdown LED red 15 Overtemperature Warning LED blinking yellow 16 Overtemperature Shutdown LED red 17 Load Level Bar Gra...

Page 11: ...onnector see Figure 2 for pin out 25 J2 Output Power Connector see Figure 2 for pin out 26 GND Connection 27 Dry Contacts Connector J3 see paragraph 8 for pin out description 28 RS232 Connector J4 see...

Page 12: ...the remote ON OFF switch ON and OFF will turn the UPS ON and OFF Please see paragraph 8 3 6 2 Visual Indicators 6 2 1 Normal Operation When the UPS is running on AC input power and both Master and Inp...

Page 13: ...n circuit and shuts down the UPS When the input AC voltage recovers the UPS will turn on automatically 6 2 4 Overload Condition If the load exceeds the rating of the UPS or there is a short circuit on...

Page 14: ...ess it is a Limited Life Item and its life expectancy depends upon its operating and storage conditions The three most important factors that determine the life of the battery are Temperature Storage...

Page 15: ...ccess cover Remove screws e Disconnect the connector by pulling upward f Unscrew the right battery s screws on the top and three screws on the right side of the UPS marked by a B on the top and recess...

Page 16: ...attery Operation 3 5 System Common Ground 6 N C 7 O Battery Voltage Low 4 8 O UPS On 5 9 O Input Power Loss Battery operation 3 Notes to Table 1 1 Pin 1 is shorted to pin 2 when any one of the followi...

Page 17: ...otes to Table 2 1 Connecting 5 to 12Vdc to pin 6 to pin 1 causes the UPS to shutdown if in Battery Mode latched 2 If AC input is good pin 7 is shorted to pin 2 and pin 3 is open If AC input is bad pin...

Page 18: ...lly shorted to J3 pin 9 not used by RS232 link 8 3 Remote ON OFF Interface J5 Important note The M110BA 1 is shipped with a matting connector plugged into J5 with a jumper that enables the unit If rem...

Page 19: ...oltage Rating Frequency Waveform 115Vac 3 grounded neutral see Note 1 2000VA 1000W 60Hz 0 2 digitally synthesized from a crystal oscillator Sinusoidal THD 2 linear load 4 non linear BATTERY Type Capac...

Page 20: ...Input Fail status lamps On Batt status lamp Batt Passed and Batt Failed lamps for battery self test Low Batt warning lamp Overload Shutdown status lamp Overtemp warning and Overtemp Shutdown lamps Whe...

Page 21: ...rge Level status of all User Programmable Options and failure diagnostic Commands UPS Shutdown UPS Standby Initiate Battery Test Enable Disable Periodic Battery Test Enable Disable Battle Mode Enable...