102
Pellerin Milnor Corporation
NOTE:
For instruction: push down travel dimensions and adjustment procedures, see
BNWVUM01
Cross Section: Machine Locked down for
Shipment
Adjustment Complete, Machine Up
Legend
A...
Machine Shell
B...
Remove shipping bolt before running machine. See
instructions for Adjustment of Hold Down
C...
Place extra shims above
D...
Unloaded 3-3/4”
E...
1/2” approx.
F...
2” travel of empty basket
G...
Setting blocks for adjustment. Blocks must hold
shell approximately 3/8” above base pads when ma-
chine is pushed down.
N1..
Be sure shell does not bottom on basepad, there must
be clearance at this point. Check each corner
N2..
Place shims here to adjust ring weldment so that all
four corners seat simultaneously.
Hold Down Adjustment
2 Sheets
6044SR2/SR3, 6044WR2/WR3, 72044SR2/SR3, 72044WR2/WR3
BPWVUJ03 / 2020245
BPWVUJ03.1
0000294996
A.3 A.5
6/11/20 2:02 PM
Released
Summary of Contents for 42044SR2
Page 2: ......
Page 9: ...1 General Service Information Pellerin Milnor Corporation 7 ...
Page 23: ...This page intentionally blank ...
Page 43: ...2 Safety Related Components Assemblies Pellerin Milnor Corporation 41 ...
Page 51: ...3 Drive Assemblies Pellerin Milnor Corporation 49 ...
Page 59: ...Pellerin Milnor Corporation 57 Drive Base 5 Sheets 4244SP2 SM Single Motor Drive Assemblies ...
Page 87: ...This page intentionally blank ...
Page 111: ...This page intentionally blank ...
Page 114: ...112 Pellerin Milnor Corporation 6 Shell and Door Assemblies ...
Page 124: ...122 Pellerin Milnor Corporation 7 Control and Sensing Assbmlies ...
Page 128: ...126 Pellerin Milnor Corporation 8 Chemical Supply Devices ...
Page 129: ...This page intentionally blank ...
Page 136: ...134 Pellerin Milnor Corporation 9 Water and Steam Piping and Assemblies ...
Page 137: ...This page intentionally blank ...
Page 154: ...152 Pellerin Milnor Corporation 10 Pneumatic Piping and Assemblies ...