Pellerin Milnor Corporation
65
BNUUUM02 / 2021024
BNUUUM02
0000274599
A.4
1/6/21 4:01 PM
Released
Drive Pulley and Belt Maintenance
BNUUUM02.C01 0000274598 A.3 A.4 A.2 2/4/20 8:08 AM Released
Figure 14.
Examples of drives this instruction applies to: one or more V-belts, attached V-belts
and tooth belts
NOTICE:
"Remove power from the machine" means use the necessary safety procedure
for your location. In the USA, this is the OSHA lockout/tagout (LOTO) procedure. More
local requirements can also apply.
WARNING:
Risk of Injury or death —
A machine in operation without safety guards
is dangerous. Drive belts can pull in your body or clothing.
�
Remove power from the machine when you do work on the
mechanisms.
�
Stay out of the machine frame when you do a test on the machine.
�
Replace all covers before you put the machine into operation.
TIP:
Read these documents from the Gates Corporation (
www.gates.com
) to know
more about pulley and belt maintenance: "Belt Drive Preventive Maintenance & Safety
Manual" and "Preserve your investment - Check Engine Belts Often."
Pulley Requirements
BNUUUM02.C02 0000274597 A.3 A.4 A.2 2/4/20 8:08 AM Released
•
Keep pulleys free of dirt, oil and other contamination.
•
Replace pulleys with groove damage.
•
Align pulleys and shafts.
•
Keep run-out in tolerance.
Condition of Grooves on Pulleys
BNUUUM02.C03 0000274611 A.3 A.4 A.2 2/4/20 8:08 AM Released
Replace a pulley if:
•
the grooves have burrs, cracks, or worn areas that can cause damage to the belts.
•
the belts touch the bottom of the groove at any point (
Summary of Contents for 42044SR2
Page 2: ......
Page 9: ...1 General Service Information Pellerin Milnor Corporation 7 ...
Page 23: ...This page intentionally blank ...
Page 43: ...2 Safety Related Components Assemblies Pellerin Milnor Corporation 41 ...
Page 51: ...3 Drive Assemblies Pellerin Milnor Corporation 49 ...
Page 59: ...Pellerin Milnor Corporation 57 Drive Base 5 Sheets 4244SP2 SM Single Motor Drive Assemblies ...
Page 87: ...This page intentionally blank ...
Page 111: ...This page intentionally blank ...
Page 114: ...112 Pellerin Milnor Corporation 6 Shell and Door Assemblies ...
Page 124: ...122 Pellerin Milnor Corporation 7 Control and Sensing Assbmlies ...
Page 128: ...126 Pellerin Milnor Corporation 8 Chemical Supply Devices ...
Page 129: ...This page intentionally blank ...
Page 136: ...134 Pellerin Milnor Corporation 9 Water and Steam Piping and Assemblies ...
Page 137: ...This page intentionally blank ...
Page 154: ...152 Pellerin Milnor Corporation 10 Pneumatic Piping and Assemblies ...