
R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
LA
70063-0400
Litho
in
U.S.A.
BMP090003/2009103B
(Sheet
1
of
2)
Main
Bearing
30022X8
_,
30022H8_
B02
8
NOTES:
Use
Loctite
Anti-Seize
Compound.
Apply
Grade
A
Loctite
to
this
surface
before
applying
the
sleeve.
The
shaft
outside
diameter
and
sleeve
inside
diameter
must
be
clean
and
free
from
oil
before
applying
Loctite.
Insure
bonding
on
at
least
75%
of
the
surface.
Use
Loctite
242
with
items
A02
and
A03.
Ensure
items
P03
and
P04
are
fully
seated
before
tightening
the
fasteners.
Bearing
Set:
T
ake
up
on
the
cup
carrier
until
the
bearings
bind
slightly
in
rotation.
Measure
the
shim
gap
and
provide
suf
ficient
artum
shim
to
allow
a
minimum
of
.004
looseness
and
a
maximum
of
.005
looseness.
Use
Loctite
680
on
outside
diameter
of
S01
and
S02.
Allow
24
hours
to
cure.
All
relevant
surfaces
must
be
clean
and
free
from
oil
prior
to
assembly
.
Position
item
A02
flush
with
P03
surface.
Add
Loctite
609
and
primer
to
the
rear
bearing
cup
and
holder
housing.
1
2
3
4
5
6
7
8
NOTE:
When
replacing
the
seal
holder
,
torque
item
P17
(a
specially
modified
bolt)
to
150
inch-pounds.
For
details
of
the
recommended
procedure,
see
.
T
orque
the
remaining
bolts
to
standard
torque.
MSSM0261AE
-
Replacing
30Fxx
Main
Bearings
Summary of Contents for 30022H8J
Page 2: ......
Page 4: ......
Page 6: ......
Page 25: ...Section 1 Service and Maintenance ...
Page 52: ......
Page 53: ...Section 2 Drive Assemblies ...
Page 61: ...Section 3 Shell Door and Assemblies ...
Page 69: ...Section 4 Water and Steam Piping and Assemblies ...
Page 79: ...Section 5 Chemical Supply Devices ...
Page 82: ......