Imp
ort
Ap
plia
nce
s.c
om
THE EASIEST WAY TO SELF-IMPORT APPLIANCES DIRECT FROM EUROPE.
Operation
22
After the vacuuming process
An acoustic tone will sound.
Open the glass lid.
Danger of burning!
The sealing bar and weld seam are
hot.
Do not touch the sealing bar or the
weld seam immediately after the va-
cuuming process.
Remove the vacuum sealing bag from
the vacuum chamber.
Before starting a new vacuuming
process, check that the vacuum
chamber and the sealing bar are
clean and dry.
Remove any soiling or liquid residues
if necessary.
Sealing the bag early
You can end the vacuuming process
before reaching the selected vacuuming
level and seal the bag early.
Touch the
sensor.
The vacuum process stops. After a few
seconds the bag will be sealed.
Successful sealing of the bag is only
possible when there is a minimum va-
cuum (vacuum level 1) in the chamber.
Touch the
sensor again if the re-
quired vacuum level has not yet been
reached. For technical reasons, a few
seconds will elapse before the bag is
sealed.