CVA615 Coffee System - Table of Contents
1.0 CONSTRUCTION & DESIGN
1.1
Appliance
Overview
1
1.1.1
Front
View
1
1.1.2
Controls
1
1.1.3 Interior (Front of Appliance
Open)
3
1.2
Technical
Data 3
1.3
Layout
of
Components
5
2.0 INSTALLATION
Installation
Procedures
7
3.0 COMMISSION and OPERATION
3.1
General
Operation
9
3.1.1
Preparing
Coffee
9
3.1.2 Canceling the Preparation
10
3.1.3
Steam
Control
10
3.1.4
Hot
Water
11
3.1.5 Adjusting the Coffee
Grinder
12
3.1.6 Filling the Coffee Bean Container
13
3.1.7
Filling
the
Water
Tank 14
4.0 DESCRIPTION of FUNCTION
4.1
Door
Switch
15
4.2
Overflow
(reed)
Switch
15
4.3 Brew Unit – Cleaning and Care
16
4.4 Removing the Brew Unit from
the
Appliance
16
4.5 Connection of Brew Unit to Drive Mechanism
17
4.6
Brewing
Procedure
17
4.7
Ground
Container
20
4.8
Waste
Unit
Present
Switch
20
4.9
Water
Tank
22
4.10
Water
Level
Switch
23
4.11
Grinder
Assembly
25
4.12
Grinder
Overload
Protection
26
4.13
Ground
Coffee
Dispensing
28
4.14
Dispenser
Switch
29
4.15
Brew
Unit
Drives
30
4.16 Water Pump
32
Summary of Contents for CVA 615
Page 1: ... 2004 Miele TECHNICAL INFORMATION CVA615 Coffee System ...
Page 2: ......
Page 12: ...Technical Information 4 CVA615 Coffee System ...
Page 14: ...Technical Information 6 CVA615 Coffee System ...
Page 16: ...Technical Information 8 CVA615 Coffee System ...
Page 48: ...Technical Information 40 CVA615 Coffee System ...
Page 108: ...Technical Information 100 CVA615 Coffee System This page intentionally left blank ...
Page 109: ...Technical Information 101 CVA615 Coffee System 6 5 Wiring Diagram ...
Page 110: ...Technical Information 102 CVA615 Coffee System This page intentionally left blank ...