Securing the switching unit
^
Carefully place the stainless steel
tepan plate facedown on top of the
worktop, either to the left or right of
the cut-out.
This must be done carefully to
prevent damage to either the
worktop or the tepan plate.
^
Stick the sealing strip
b
supplied to
the edge of the tepan plate from
below (see illustration).
^
Place the switching unit in position,
as illustrated with its spindle and
indicator lights pressed from inside
into the drill holes made previously.
Secure the switching unit with the
Spax screws
a
supplied.
CT 400 P installation instructions
25
Summary of Contents for CT 400 MP
Page 5: ...CT 400 MP dimensions Description of the appliance 5 ...
Page 32: ...32 ...
Page 33: ...33 ...
Page 34: ...Alteration rights reserved xx06 M Nr 06 760 290 02 en ...