Supervisor level
87
Network time
The date and time can be synchron-
ised over the network.
- Off
The date and time are not synchron-
ised over the network.
- As master
The machines are in a network but
are not connected to the Internet. A
machine is declared as the master
and sends data to the
slave
devices.
- As slave
The machines are in a network and
are connected to the Internet. All ma-
chines are configured as
slaves
. Data
is synchronised over the Internet.
External programme lock
The control unit has an option to block
programmes. Programmes are
blocked by an external system via the
COM interface.
Factory default: Off
Peak load signal
The peak-load negotiation function
enables the washing machine to be
connected to an energy management
system. When a signal is registered,
the washing machine's heater is
switched off for a short period. The
washing machine may only be oper-
ated with a peak-load system if this
system is connected to the washing
machine via the Miele XCI box.
- No function (factory default)
- Peak load with 230 V
- Peak load with 0 V
Peak load prevention
The peak-load negotiation function
can be deactivated with disinfection
programmes. When a signal is re-
gistered, the washing machine's
heater is not switched off.
Factory default: Off
Summary of Contents for 51506263IRL
Page 92: ......
Page 93: ......
Page 94: ......
Page 96: ...M Nr 11 881 010 00 en GB PWM 506 Mop Star 60 ...