Service manual
17
8. Installation details
8.1
Wrench torque sheet for installation
Outside diameter
Torque
mm
inch
Kg.m
φ
6.35
1/4
1.8
φ
9.52
3/8
4.2
φ
12.7
1/2
5.5
φ
15.88
5/8
6.6
φ
19.05
3/4
6.6
8.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
7K
9K
12K
18K
21K
24K
28K
mm
2
1.0
1.0
1.5
2.5
2.5
2.5
2.5
8.3
Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS
LIQUID
Standard
length
(m)
Max.
Elevation
B (m)
Max.
Elevation
B (m)
Additional
refrigerant
(g/m)
3/8’’ (
φ
9.52)
1/4’’ (
φ
6.35)
5
5
10
30
7k~12K
1/2’’ (
φ
12.7)
1/4’’ (
φ
6.35)
5
5
10
30
1/2’’ (
φ
12.7)
1/4’’ (
φ
6.35)
5
8
15
30
5/8’’ (
φ
15.88)
1/4’’ (
φ
6.35)
5
10
20
30
18K~28K
5/8’’ (
φ
15.88)
3/8’’ (
φ
9.52)
5
10
20
65
5/8’’ (
φ
15.88)
3/8’’ (
φ
9.52)
5
15
30
65
30K~36K
3/4’’ (
φ
19.05)
3/8’’ (
φ
9.52)
5
15
30
65
Summary of Contents for MSE-07CR
Page 1: ...Cover MSE 07CR MSE 07HR MSE 09CR MSE 09HR MSE 12CR MSE 12HR MSE 18CR MSE 18HR...
Page 12: ...Service manual 9 5 Refrigerant cycle diagram Cooling only Heat pump mode...
Page 14: ...Service manual 11...
Page 15: ...Service manual 12 7 Schematic diagram and Wiring diagram 7 1 Schematic diagram...
Page 16: ...Service manual 13 7 2 Wiring diagram MSE 07CR MSE 09CR MSE 12CR...
Page 17: ...Service manual 14 MSE 07HR MSE 09HR MSE 12HR...
Page 25: ...Service manual 22 discharged...