MCAC-UTSM-12
71
Uncover the screw-cap in the air intake panel, and then lessen
the screws.
Take off the air intake panel; ensure which place secure enough
will not make risk to the other people.
Fig-13
NOTE:
Please beware of the foot screw, which may be hurt for the
pass-by people, make sure enough security of that, prevent
accident
occurs.
3. Installation of Outdoor Units
3.1 Important: Construction Checkpoints
1). Installation
Check the model and name to avoid mistaken installation.
2). Refrigerant pipe
The refrigerant pipes must have the specified diameter.
Nitrogen of a certain pressure must be filled into the refrigerant pipe before welding.
The refrigerant pipe must undergo heat insulation treatment.
After the refrigerant pipe is installed completely, the indoor unit cannot be powered on before performing
the airtight test and creating a vacuum.
3). Pressure test
The refrigerant pipe must undergo the airtight test [with 2.94MPa (30kgf/cm
2
G) nitrogen].
4). Creating a vacuum
Be sure to use the vacuum pump to create a vacuum of the connective pipe at both air side and liquid side
concurrently.
5). Refrigerant replenishment
If the pipe is longer than the reference pipe, the refrigerant replenishment quantity for each outdoor unit
should be calculated through the formula obtained according to the actual length of the pipe.
Record the refrigerant replenishment quantity, actual length of pipe and the height difference of the indoor &
outdoor units onto the operation confirmation table (on the electric control box) of the outdoor unit in
advance for future reference.
6). Electric wiring
Select the power supply capacity and wire size according to the design manual. The power wire size of the
air conditioner should be greater than that of ordinary motors.
Put down the air intake panel, before electric connection:
Summary of Contents for MDFA-76CRN2
Page 7: ...MCAC UTSM 12 8 3 Dimensions 3 1 MDTA 76C H RN2 MDTA 96C H RN2...
Page 8: ...MCAC UTSM 12 9 3 2 MDTA 120C H RN2...
Page 11: ...MCAC UTSM 12 12 6 Wiring Diagrams 6 1 MDTA 76CRN2 MDTA 96CRN2...
Page 12: ...MCAC UTSM 12 13 6 2 MDTA 76HRN2 MDTA 96HN2 6 3 MDTA 120CRN2...
Page 13: ...MCAC UTSM 12 14 6 4 MDTA 120HRN2...
Page 36: ...MCAC UTSM 12 37 6 Wiring Diagrams 6 1 MDFA 76CRN2 MDFA 96CRN2 CN20 CN20 CN20...
Page 37: ...MCAC UTSM 12 38 6 2 MDFA 76HRN2 MDFA 96HRN2 CN20 CN20 CN20...
Page 51: ...MCAC UTSM 12 53 2 Dimension 2 1 MDOV 76C H CN2 MDOV 96C H CN2...
Page 52: ...MCAC UTSM 12 54 2 2 MDOV 120C H CN2...
Page 55: ...MCAC UTSM 12 57 4 Wiring Diagrams 4 1 MDOV 76C CN2 MDOV 96C CN2 MDOV 120C CN2...
Page 56: ...MCAC UTSM 12 58 4 2 MDOV 76H CN2 MDOV 96H CN2 MDOV 120H CN2...
Page 87: ...UTSM 12 90 Floor standing type cooling and heating type 76 kBtu h 96 kBtu h...