MCAC-UTSM-12
67
2.1 Installation
of Duct
2.1.1 Installation Space
Ensure enough space required for installation and maintenance.
(Fig-1
and Fig-2)
Electric control box
Inspection hole
≥6
0
0
m
m
≥5
0
0
m
m
Fig-1 Fig -2
2.1.2 Install
Φ
10 Pendant Bolts Or Ground Bolts (Fig-3)
Fig-3
1.
Use f10 or bigger screws. The screw material is high-quality carbon steel (whose surface is zinc plated or
undergoes other rustproof treatment) or stainless steel.
2.
The treatment of the ceiling varies between buildings. For detailed measures, consult with the fitting-out
staff.
3.
Fix the pendant bolts firmly and reliably in light of the specific situation.
4.
Installation of the pendant bolt in different environments.
MTA-120C(H)R
MTA-150C(H)R
MTA-76C(H)R
MTA-96C(H)R
2. Installation of Indoor Units
Summary of Contents for MDFA-76CRN2
Page 7: ...MCAC UTSM 12 8 3 Dimensions 3 1 MDTA 76C H RN2 MDTA 96C H RN2...
Page 8: ...MCAC UTSM 12 9 3 2 MDTA 120C H RN2...
Page 11: ...MCAC UTSM 12 12 6 Wiring Diagrams 6 1 MDTA 76CRN2 MDTA 96CRN2...
Page 12: ...MCAC UTSM 12 13 6 2 MDTA 76HRN2 MDTA 96HN2 6 3 MDTA 120CRN2...
Page 13: ...MCAC UTSM 12 14 6 4 MDTA 120HRN2...
Page 36: ...MCAC UTSM 12 37 6 Wiring Diagrams 6 1 MDFA 76CRN2 MDFA 96CRN2 CN20 CN20 CN20...
Page 37: ...MCAC UTSM 12 38 6 2 MDFA 76HRN2 MDFA 96HRN2 CN20 CN20 CN20...
Page 51: ...MCAC UTSM 12 53 2 Dimension 2 1 MDOV 76C H CN2 MDOV 96C H CN2...
Page 52: ...MCAC UTSM 12 54 2 2 MDOV 120C H CN2...
Page 55: ...MCAC UTSM 12 57 4 Wiring Diagrams 4 1 MDOV 76C CN2 MDOV 96C CN2 MDOV 120C CN2...
Page 56: ...MCAC UTSM 12 58 4 2 MDOV 76H CN2 MDOV 96H CN2 MDOV 120H CN2...
Page 87: ...UTSM 12 90 Floor standing type cooling and heating type 76 kBtu h 96 kBtu h...