6.4 Installation for the first time
Air and moisture in the refrigerant system have
undesirable effects as below:
●
Pressure in the system rises.
●
Operating current rises.
●
Cooling or heating efficiency drops.
●
Moisture in the refrigerant circuit may
freeze and block capillary tubing.
●
Water may lead to corrosion of parts in the
refrigerant system.
Therefore, the indoor units and the pipes
between indoor and outdoor units must be leak
tested and evacuated to remove gas and
moisture from the system.
Gas leak check (Soap water method):
Apply soap water or a liquid neutral
detergent on the indoor unit connections or
outdoor unit connections by a soft brush to
check for leakage of the connecting points of
the piping. If bubbles come out, the pipes have
leakage.
1. Air purging with vacuum pump
1) Completely tighten the flare nuts of the
indoor and outdoor units, confirm that both
the
2-way and 3-way valves are set to the
closed position.
2) Connect the charge hose with the push pin
of handle lo to the 3-way valves gas service
port..
3) Connect the charge hose of handle hi
connection to the vacuum pump.
4) Fully open the handle Lo of the manifold
valve.
5) Operate the vacuum pump to evacuate.
6) Make evacuation for 30 minutes and check
whether the compound meter indicates
-0.1Mpa(14.5Psi)
. If the meter does not
indicate
-0.1Mpa(14.5Psi)
after pumping 30
minutes, it should be pumped 20 minutes
more. If the pressure can’t achieve
-0.1Mpa(14.5Psi
) after pumping 50 minutes,
please check if there are some leakage points.
Fully close the handle Lo valve of the
manifold valve and stop the operation of the
vacuum pump. Confirm that the gauge needle
does not move (approximately 5 minutes after
turning off the vacuum pump).
7) Turn the flare nut of the 3-way valves about
45° counterclockwise for 6 or 7seconds
after the gas coming out, then tighten the
flare nut again. Make sure the pressure
display in the pressure indicator is a little
higher than the atmosphere pressure. Then
remove the charge hose from the 3 way
valve.
8) Fully open the 2 way valve and 3 way valve
and securely tighten the cap of the 3 way
valve.
6.5 Adding the refrigerant after running
the system for many years
Procedure:
1). Connect the charge hose to the 3-way service
port, open the 2-way valve and the 3-way valve.
Connect the charge hose to the valve at the
bottom of the cylinder. If the refrigerant is
Summary of Contents for MCHS-09PSH1
Page 1: ...Mission 3D Inverter Series Service Manual 2016 MBSUL A 1604...
Page 8: ...For 9k 12k For 18k 24k For 30k 36k...
Page 11: ...5 Wiring Diagram 5 1 Indoor Unit MEHS 09PSH1 MEHS 12PSH1 MEHSU 09PHH2 MEHSU 12PHH2...
Page 12: ...MEHSU 18PHH2 MEHSU 24PHH2 MEHS 30PSH2 MEHS 36PSH2...
Page 13: ...5 2 Outdoor Unit MCHS 09PSH1 MCHS 12PSH1 MCHSU 09PHH2 MCHSU 12PHH2 MCHSU 18PHH2...
Page 14: ...MCHSU 24PHH2 MCHS 30PSH2 MCHS 36PSH2...
Page 45: ...P W N U...
Page 46: ...N V N W...
Page 78: ...compressor on bottom plate 4 Lift the compressor from the base pan assembly 3...