
调高器说明书
10
M Commands between CNC System and
Height Controller
10.1 M C
ommands from CNC System for Direct Control of Output Port
M14/M15
On/off switch fo
r ascending of cutting
t
orch, M14 (on), M15 (off)
M16/M17
On/off switch for descending of cutt
ing t
orch, M16 (on), M17 (off)
M38/M39
automatic/manual swit
ch of height controller
M38 (auto) M39 (manual)
10.2
M Commands for Routine Cycles
M07 fixed perforation cycle
The sequence of flame cutting operat
ion
is as follows:
M07
1. If the gas (acet
ylene) valve is not opened yet, then open it and start ignit
ion;
2.
The
cutting
torch
descends
(the
descending
t
ime
delay
of
cutting
torch
starts,
see
M71);
3. Open the preheating
oxygen valve to
start
the preheating
delay.
If the preheating
time
is
not
enough,
press
the
key
【
pause
】
,
the
preheating
time
will
extend
to
150
seconds
aut
omat
ically. If the preheating is completed before the
time delay is up, press
the key
【
st
art
】
t
o end t
he preheating delay; in the mean time,
the new preheating time
will be saved automatically in the preheating delay parameter;
4. The cut
ting torch ascends(the ascending time delay of cutting torch for perforat
ion
starts, see M72);
5.
Open
the
cutting
oxygen
valve
(M12),
perforat
ion
delay
time
starts.
At
the
end
of
the
delay
time,
the
cutting
torch
will
descend
(the
descending
time
delay
of
cutting
torch for perforation starts, see M73)
;
6. Turn on the height controller (M38) and start
the subsequent procedures..
is
as
follows:
41
PDF 文件使用 "pdfFactory Pro" 试用版本创建
www.fine
print.com.cn
The sequence of plasma cutting operation