InTagral™ Plus
Time & Attendance Clock
Page 4-7
4.1.3.2.
Exiting a project
To exit a project do one of the following (choose appropriate exit method
according to relevant situation, as described below):
•
Exit a project without assigning employee to different project
:
Press the Functional Key (F1/F2) that was defined using the
ClockComm application's Key Mapping function to present the
available projects list. Then press the
OUT
key.
•
Enter a new project automatically (exits employee from
current project):
Repeat steps 1 to 8 in paragraph
4.1.3 above.
•
Exit a project at the end of the workday:
Perform an OUT
transaction.
Upon exiting a project in which the Quantity option is enabled (see
paragraph 8.3.2.
Add, Delete or Edit Projects
in the
OnTime Pro/OnTime Pro
Extra User Manual
), the following screen appears, asking employee to enter
the number of items produced on the time worked on that project:
Enter quantity produced, then press the
ENT
button.
Summary of Contents for InTagral Plus
Page 1: ...InTagral Plus TIME ATTENDANCE CLOCK USER GUIDE REV 1 0...
Page 2: ......
Page 3: ...InTagral Plus TIME ATTENDANCE CLOCK USER GUIDE REV 1 0...
Page 4: ......
Page 6: ......
Page 10: ......
Page 18: ......
Page 32: ......
Page 60: ......