InTagral™ Plus
Time & Attendance Clock
Page 4-5
4.1.3.1.
Entering a project
Before starting work on a specific project, employee must do the following:
1 Press the Functional Key (F1/F2) that was defined using the
ClockComm application's Key Mapping function (see
Chapter 5 -
Parameters
in the ClockComm User Manual) to present the available
projects list. The following clock screen appears:
2 Swipe ID card. The following clock screen appears, displaying the list
of available projects:
NOTES
•
The displayed project list includes both Global projects, and projects that are associated with this
specific employee
•
The "
+
" sign to the right of a project indicates this employee's currently active project (appears
only when this employee is registered as currently working on the marked project)
3 Navigate in the project list using the clock's arrow keys
Summary of Contents for InTagral Plus
Page 1: ...InTagral Plus TIME ATTENDANCE CLOCK USER GUIDE REV 1 0...
Page 2: ......
Page 3: ...InTagral Plus TIME ATTENDANCE CLOCK USER GUIDE REV 1 0...
Page 4: ......
Page 6: ......
Page 10: ......
Page 18: ......
Page 32: ......
Page 60: ......