The first line of this window displays the
number of engineer days it will take to
produce the item(s). One technician day is the
amount of work one technician can carry out
in one day.
The next two lines show the cost to produce
one unit and the workspace required.
You may cancel production at this stage by
clicking on the Cancel button. To accept the
production and continue, click on the Start
Production button.
The Technician Allocated window appears.
This displays the Technicians Available and
the Workshop Space Available as on the
Current Production screen, but allows you to
set both the number of technicians allocated
and the number of items to produce.
Click on the up/down arrows to increase or
decrease the number of technicians allocated
to the production and the number of units of
the item to produce. You may cancel
production at this stage by clicking on the
Stop Production button. To accept the
production and return to the Production Items
window, click on OK.
Click on OK in the Production Items window
to exit to the Current Production screen.
Technicians Allocated/Units to Produce
Use the mouse to highlight and click on any
manufacture project to alter the number of
technicians allocated to that project. This is
identical to the Technicians Allocated window
described above. The more technicians
involved, the quicker the manufacture will be
completed.
Click on OK to exit to the Current Production
screen.
Click on OK in the Current Production screen
to return to the Bases screen.
71
TERROR FROM THE DEEP
TERROR FROM THE DEEP
X-COM 2 manual part 2 for PDF 3/4/97 5:04 PM Page 71