2.0 Installation Regulations and Requirements
The installation of ProCon HT boilers must be in accordance with the relevant
requirements of Gas Safety (Installation & Use) Regulations 1994, Health & Safety at
Work Act, Building Regulations, IEE Regulations, Construction (Design &
Management) Regulations 1994, Local Authority Bye-Laws, National, Fire Regulations
and Insurance Company requirements.
The following Codes of Practice are also applicable:-
BS 5449: 1990 Specification for forced circulation hot water central heating systems
for domestic premises.
BS 6644: 2011 Specification for gas fired hot water boilers of rated inputs between
70kW (net) and 1.8MW(net) (2nd and 3rd family gases).
BS 6798: 1987 Specification for installation of gas fired hot water boilers of rated
input not exceeding 60 kW.
BS 6880: 1988 Code of Practice for low temperature hot water heating systems of
output greater than 45kW. Parts 1, 2 & 3.
BS 6891: 1988 Specification for installation of low pressure gas pipework of up to
28mm (R1) in domestic premises (2nd family gases)
BS 7593: 1992 Code of Practice for treatment of water in domestic hot water central
heating systems.
BS 7671: 1992 Requirements for electrical installations. IEE Wiring
Regulations.Sixteenth edition.
CISBE Guide reference sections B7, B11 and B13.
CP342 Part 2: 1974 Code of Practice for centralized hot water supply.
GE/UP/2 Gas installation pipework, boosters and compressors on industrial and
commercial premises.
IGE/UP/4 Commissioning of gas fired plant on industrial and commercial premises
IGE/UP/10 Installation of gas appliances in industrial and commercial premises. Part
1: Flued appliances.
And any addition prevailing regulation and or code of practice not detailed above.