29
parallel UPS redundant and
for increased output
See figure 22.
■
isolate all UPSs
Proceed in the following order (see figure
23):
❏
shut down the inverters (press the
"inverter OFF" buttons 8 for three sec-
onds),
❏
close switch Q3BP and open switch
Q5N in the external bypass unit,
❏
open switches Q1, QF1 and Q5N on the
UPS units.
■
start-up
Following servicing, proceed in the follow-
ing order (see figure 24):
❏
close switches Q5N on the UPS units,
❏
close switch in the external bypass unit,
❏
open switch Q3BP in the parallel-con-
nection unit,
❏
close switches Q1 and QF1 on the UPS
units,
❏
start the inverters (press the "inverter
ON" buttons 7 ).
NOTE
We recommend that you
call on the after-sales
support department to
carry out these opera-
tions.
Note that for parallel
UPSs for increased out-
put, the entire installation
must be bypassed
because it is not possible
to isolate just one UPS
unit.
Maintenance
Fig. 24
Fig. 23
Fig. 22
2
3
4
5
1
0
1
0
1
0
1
0
Q5N
Q3BP
Q5N
Q1
Q4S
QF1
0
I
external bypass
7
5
6
1
Galaxy PW
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
2
3
4
5
1
0
1
0
1
0
1
0
Q5N
Q3BP
Q5N
Q1
Q4S
QF1
0
I
external bypass
7
5
6
1
Galaxy PW
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
2
1
Q3BP
Galaxy 1
Galaxy 2
2
1
Galaxy 3
2
1
Galaxy 4
2
Q5N
1
2
Q1
QF1
Q5N
Q4S
User’s Manual
Summary of Contents for Galaxy PW
Page 1: ...Galaxy PW 100 to 225 kVA User s Manual w w w m g e u p s c o m ...
Page 2: ......
Page 4: ...ii Chapter name Galaxy PW 100 to 225 kVA User s Manual This page intentionally left blank ...
Page 6: ...This page intentionally left blank iv ...
Page 8: ...This page intentionally left blank vi ...
Page 40: ...This page intentionally left blank 32 ...
Page 42: ...34 ...
Page 43: ...35 ...
Page 44: ...1660 Scenic Avenue Costa Mesa California 92626 714 557 1636 w w w m g e u p s c o m ...