1-800-325-9103
PB-FATBOY
- 35 -
www.meyermfg.com
8.2 ADJUSTMENTS
Visually inspect the tension on the apron chains through the
two slots (Item 1).
The second apron chain slat (approximately three feet back
from the front of the box) should be 1/8” to 1/4” off the return
slides (both sides).
Tighten the adjuster bolts (Item 2) at each end of the front
sprocket shaft equally.
NOTE: If adjuster bolt(s) reaches maximum travel,
remove equal links from each strand. Removable
links are provided in the chain.
Shutoff and lockout power before performing machine service,
adjusting, maintaining, or clearing an obstruction from this machine.
Refer to section 5.3 SHUTOFF & LOCKOUT POWER.
3’
TIGHTENER END OF BOX
SIDE VIEW
2
2
2
2
1
Apron Chain Adjustment Bolts
1
Summary of Contents for BOSS RT FATBOY 1026RT RR
Page 10: ...Meyer Manufacturing Corporation 10 PB FATBOY ...
Page 32: ...Meyer Manufacturing Corporation 32 PB FATBOY ...
Page 40: ...Meyer Manufacturing Corporation 40 PB FATBOY ...
Page 41: ...NOTES ...
Page 42: ...NOTES ...