4
INSTALLATION DETAILS
Clearance to Combustibles - Installation Clearances
Please refer to the following figures for all clearances to combustibles. Please note that these
clearances are for your METRO pellet fire only.
Minimum clearances shown are in mm, and all figures for clearances are to combustible materials. All
Metro pellet fires are tested using all applicable procedures and equipment under AS/NZS2918:2001.
We recommend sufficient space be provided (minimum 500mm) on each side of the pellet fire to service
the unit. If this is not possible, provision must be made available to remove the unit for servicing.
Freestanding Dimensions
285mm
470mm
615mm
613mm
788mm
250mm
175mm
120mm
100mm
650mm
950mm
120mm
120mm
100mm
1000mm
1280mm
100mm
100mm