Metal-Fach SMART EKO-CARBON Series Operation And Maintenance Documentation Download Page 31

 

30 

Warranty claim 

Client's details: ………………………………………………………………………………… 
 
………………………………………………………………………………….……………… 

(first name, second name, address, contact number) 

 
Purchase document number: date: …………………………………………………………… 
 
Payment document number: ………..……….………………………………………………. 
 
Seller’s signature: ………………………………………………………………………… 
 

Batch and product numbe

r: …………………………………….………………………… 

 
………………………………….………….……………………………………………… 
 
Name of the product under warranty: ……………………………………………… 
 
…………………………………………………………………………………………………. 
 
Warranty period::           valid                           invalid 
 
Detailed description of the fault: ………………………………………………………………….. 
 
…………………………………………………………………………………………………. 
 
…………………………………………………………………………………………………. 

Warranty comencement conditions: 

1. 

Payment confirmation from the point of sale is the condition of warranty procedure comencement. 

2. 

The warranty card is the only condition for free repair. 

3. 

A person filing a claim assumes the obligation to reimburse expenses incurred by METAL FACH Jacek Kucharewicz in the event of an unjustified call of the service team or failure to meet the conditions specified 
in points 1 or 2 (net cost of every commenced hour of one service technician’s work - PLN 70, net travel cost PLN 1/km in both directions). 

4. 

Legible signature of the Purchaser to confirm the familiarisation with the warranty procedure conditions 

 
 
 

…………………………………………………………………………                               ………………………………………………………………………… 

(legible signature of Purchaser) 

                                                     

 

    (Warrant's signature) 

 

I declare, that I have read and understood the Warranty Conditions under which I am claiming warranty and I allow my personal data to be processed for the purpose of warranty, in accordance with the Personal 

Data Protection Act dated 29/08/1997 (Dz. Ust. No. 133, item 883). 

 

………………………………………………………………………… 

(legible signature of Purchaser) 

 
The Producer is obligated to take warranty actions within 14 days from receiving the claim in writing on the produce

r’s form. 

 
Personal data given in this form are processed by Jacek Kucharewicz, conducting economic activity under the company name Metal Fach Jacek Kucharewicz, 16-

100 Sokółka, ul. Sikorskiego 66, NIP (Taxpayer 

Identification Number): 545-100-10-62, telephone 48 85 711 94 for the purpose of performing the provisions set forth in the guarantee terms - pursuant to the act of 29 August 1997 on personal data protection 
(consolidated text: Journal of Laws of 2014, item 1182). The User has the right to access their personal data, correct them, demand cessation of processing of their personal data, as well as to raise an objection against 
processing  of  data  in cases  specified  by  the  law.  Any  correspondence  concerning  processing  of  personal  data  is  to  be  addressed  to:  Metal  Fach  Jacek  Kucharewicz,  16-

100 Sokółka, ul. Sikorskiego 66. Providing 

personal data is voluntary. Pursuant to the act of 29 August 1997 on personal data protection (consolidated text: Journal of  Laws of 2014, item 1182), we hereby inform that the personal data given in this form will be 
subject to protection against access by unauthorized persons. 

 

 

 

Summary of Contents for SMART EKO-CARBON Series

Page 1: ...SMART EKO CARBON OPERATION AND MAINTENANCE DOCUMENTATION ENGLISH TRANSLATION OF THE ORIGINAL MANUAL ISSUE I 2018 04 01...

Page 2: ...rent norms and standards guaranteeing safety and dependable use Using the device in accordance with the provided manual ensures effective and dependable operation The boiler is not meant to be operate...

Page 3: ...28 Warranty claim 30 Start up report 32 Start up report 34 List of tables Tab 4 1 Boiler equipment 4 Tab 7 1 Boiler dimentions mm SMART EKO CARBON 6 Tab 8 1 Technical specifications SMART EKO CARBON...

Page 4: ...on USER The maintenance and operation documentation is a part of the product that comes with the delivered boiler The Operation and Maintenance Documentation contains data concerning the design instal...

Page 5: ...s 1 ATTENTION The user should thoroughly read the instruction manual of the regulator fan and feeder along as well as the burner ATTENTION METAL FACH reserves the right to implement changes to the par...

Page 6: ...CARBON 30 180mm does not have a damper The ash pan for waste material from the furnace is situated under the burner The steel door is lined with insulating panels from the inside The boiler is equipp...

Page 7: ...er dimentions mm SMART EKO CARBON TYPE SMART EKO CARBON 15 SMART EKO CARBON 20 SMART EKO CARBON 25 SMART EKO CARBON 30 A 1270 1270 1310 1310 B 545 545 590 590 C 1300 1350 1350 1450 D 545 615 710 710 E...

Page 8: ...3 3 3 Maximum working temperature C 95 95 95 95 Test pressure bar 4 5 4 5 4 5 4 5 Boiler class 5 5 5 5 Boiler efficiency 90 90 90 90 Single fuel load L 200 200 200 200 Fuel eco pea coal Power supply...

Page 9: ...face the exhaust ventilation should be provided by an exhaust duct of 14 x 14 diameter and made from noncombustible material Its outlet should be installed under the ceiling of the boiler room The exh...

Page 10: ...Boiler installation USER INSTALLER The important element of installation is correct setting and levelling of the SMART EKO CARBON boilers The boilers do not require special base and need to be levele...

Page 11: ...Easily ignited Asphalt plywood celluloid compound polyurethane polystyrene polyethylene plastics PVC 13 Connecting the boiler to the heating system INSTALLER The connecting of the boiler to the centr...

Page 12: ...l pipe RB Safety pipe T1 Temperature P1 Pressure Schematic 13 2 Connecting boilers to the heating system diagram Tab 13 2 Symbols applied in the schematics Designation Key T Temperature sensor Tk Boil...

Page 13: ...6 Heating circle 7 Floor heating 8 Central heating pump CO 9 N 10 N 11 R 12 M 13 P 14 O 15 O 16 P Schematic 13 4 Connecting the boiler to the heating system with Laddomat and buffer 9 Central heating...

Page 14: ...Preventing heightened pressure Safetly fixtures It includes safety valve manometer and deaerator ATTENTION The boiler installed in the closed system must be equipped with all the safety devices liste...

Page 15: ...d deaerates the installation The vessel should be installed in the top most point of the installation and if possible vertically above the boiler boilers The capacity of the vessel should be calculate...

Page 16: ...culation BH upper CT4 buffer temp sensor BL lower CT4 buffer temp sensor WS CT6 P weather temperature sensor FT CT2S flue gas temp sensor TR universal thermostat of mixer open close H outlet for contr...

Page 17: ...ulated circuit temperature sensor mixer 4 CT4 type RM3 mixer 3 room thermostat RM4 mixer 4 room thermostat FS BU feeder fuel level sensor H2 outlet to the back up boiler control or alarm or hot tap wa...

Page 18: ...chimney and the closest tree top line should be at least 6m 18 Boiler start up USER INSTALLER ATTENTION The controller settings can be regulated depending on the variety of the existing central heatin...

Page 19: ...ler do not place any flammable material in the close vicinity of the boiler during ash removal any flammable materials should be kept at a distance of 150 cm from the boiler the ash should be placed i...

Page 20: ...ling Eye hole sealing Door sealing Feeder sealing Door handle 23 Possible faults and malfunctions USER Before calling the helpline read the FAQ section of the manual ATTENTION Please remember that in...

Page 21: ...on the flue Check the sealant on the door Regulate the airflow Regulate the controller or call the helpline Why is there grime in the boiler There are few conditions in which grime collects in the bo...

Page 22: ...tral tap water circuit If the water in the tank is kept below 50o C the bacteria settles The situation is possible to take place when the tank temperature is kept below 50o C or when the taps are rare...

Page 23: ...ature exceeds 90o C The hold time is too short Cool down the boiler What does the fumes sensor damaged alarm mean It means that the fumes temperature has exceeded 320o C The fumes temperature sensor i...

Page 24: ...e guidelines given in the appliance s Operation and Maintenance Documentation 5 Performance of first boiler start up within 6 months from the date of the appliance s installation by the fitter in acco...

Page 25: ...y a specialized company indicated by the Guarantor 6 Performance of the obligations arising from the guarantee will occur within 14 work days counting from the date on which the appliance is made avai...

Page 26: ...25 Confirmation of performance of inspection guarantee repair maintenance service Item no Date of performance Description of performed activities Contractor s signature and seal 1 2 3 4 5 6 7 8 9...

Page 27: ...26 10 11 12 13 14 15 16 17 18 19 20...

Page 28: ...2 Norm PN EN ISO 12100 2012 Safety of machinery Basic concepts principles for design part 1 Basic terminology Methodology 3 Norm PN EN 1708 1 2010 Welding Basic welded joint details in steel Part 1 Pr...

Page 29: ...ms pursuant to the act of 29 August 1997 on personal data protection consolidated text Journal of Laws of 2014 item 1182 The User has the right to access their personal data correct them demand cessat...

Page 30: ...29...

Page 31: ...ty in accordance with the Personal Data Protection Act dated 29 08 1997 Dz Ust No 133 item 883 legible signature of Purchaser The Producer is obligated to take warranty actions within 14 days from rec...

Page 32: ...31...

Page 33: ...is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feeder and boiler S...

Page 34: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Page 35: ...screw rotation is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feed...

Page 36: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Page 37: ...36...

Page 38: ...METAL FACH JACEK KUCHAREWICZ UL SIKORSKIEGO 66 16 100 SOK KA TEL 48 85 711 94 54 WWW METALFACH COM PL SERVICE INFOLINE CALL US 48 663 453 222 WRITE TO US p czepiel metalfach com pl...

Reviews: