9
ATTENTION!
For more information on boiler room construction, refer to the 12.03.2009 Minister
of Infrastructure Law.
TIP!
The rules included in the law serve only as guidelines which must be verified as the
law is amended.
Schematic 11.1 Minimal requirements for the boiler room
12.
Boiler installation
(USER/INSTALLER)
The important element of installation is correct setting and levelling of the SMART EKO-
CARBON boilers. The boilers do not require special base and need to be leveled with adjustable
feet. The boiler must be set in the vertical position.
1.
Check that four adjustable feet have been provided
2.
Level the boiler in relation to the floor (if the position
of the boiler is level, there is no need for the feet)
3.
Place the feet into the dedicated slots.
Summary of Contents for SMART EKO-CARBON Series
Page 27: ...26 10 11 12 13 14 15 16 17 18 19 20...
Page 30: ...29...
Page 32: ...31...
Page 37: ...36...