Metal-Fach SMART EKO-CARBON Series Operation And Maintenance Documentation Download Page 24

 

23 

Warranty conditions 

(USER) 

 
User’s Declaration: 
 
I hereby declare that th

e boiler (hereinafter also referred to as the “appliance”) has been delivered 

to  me  as  per  my  order,  new  and  complete.  The  Seller  has  familiarized  me  with  the  appliance’s 
operation  and  provided  a  complete  set  of  documentation  (including,  in  particular:  Operation  and 
Maintenance  Documentation  including,  among  other  things, instructions  for  installation  and  use  of  the 
appliance,  guarantee  terms).  I  take  note  of  the  manufacturer’s  recommendation  to  conduct  annual 
technical inspections of the appliance, which are to be confirmed on the guarantee card.  

 
 

……………………………………………………………. 

Date and legible signature of the User 

 

 

 
 

Scope of the guarantee: 

 
1.  Liability  arising  from  the  guarantee  covers  only  defects  resulting  from  causes  present  in  the 

appliance at the time of its issue to the User.  

2.  A  guarantee  on  the  appliance  is  granted  by  the  manufacturer  (also  referred  to  as  the 

"Guarantor”): Jacek Kucharewicz, conducting economic activity under the company name Metal 
Fach  Jacek  Kucharewicz,  16-

100  Sokółka,  ul.  Sikorskiego  66,  NIP  (Taxpayer  Identification 

Number): 545-100-10-62, REGON 050073833, tel48 85 711 94 56). 

3.  Under the guarantee, the User obtains the right to free repair of the appliance if defects of the 

appliance  are  revealed  during  the  guarantee  period.  In  the  event  where  the  Guarantor 
determines that it is impossible to repair the appliance or part thereof, the Guarantor reserves 
the right to replace the appliance or part thereof with a new one. 

 

Guarantee period:  

 
On  the  appliance  (boiler) 

– 2 years from the date of sale, but no longer than 36 months from the 

date of its production, with the exception of: 

a)  the exchanger 

– the guarantee on which has a duration of 5 years from the date of sale; 

b)  moving parts, cast iron, mechanical parts, parts of the worm, igniter 

– the guarantee on which 

has a duration of 1 year from the date of sale; 

c)  consumables  (e.g.  sealing  cord,  seals,  vermiculite,  chamotte),  electrical  components,  bolt 

securing the worm’s clutch, pins – which are not covered by the guarantee. 

 
Terms of exercising rights under the guarantee: 

 
1.  Installation  of  the  appliance  according  to  the  Operation  and  Maintenance  Documentation 

(particularly connection of the boiler to a properly built installation, performance of first start-up 
according  to  the  guidelines 

of  the  appliance’s manufacturer,  application  of  devices  protecting 

the boiler against return of cold water (four-way valve with actuator, laddomat, etc.) 

2.  Sending  a  copy  of  the  guarantee  card,  properly  filled  out,  signed  and  sealed  by  the  Seller,  to 

the Ma

nufacturer’s address within 30 days from the date of the appliance’s sale 

3.  Presentation of the guarantee card, properly filled out (signed and sealed by the seller), at the 

time of filing a claim, along with proof of the appliance's purchase (e.g. receipt,  invoice). In the 
event of the User’s loss of the guarantee card, a duplicate will not be issued. 

4. 

Adherence by the User to the guidelines given in the appliance’s Operation and Maintenance 
Documentation. 

5.  Performance of first boiler start-up within 6 months 

from the date of the appliance’s installation 

by  the  fitter  in  accordance  with  the  guidelines  given  in  the  Operation  and  Maintenance 
Documentation,  by  a  person  holding  a  valid  license  to  do  so  (Information  concerning  persons 
licensed to start up the boiler is available from the Guarantor - +48 85 711 94 56), confirmation 
of  this  fact  in  the  guarantee  card,  and  submission  of  a  start-up  report  to  the  Guarantor.  First 
boiler start-up is a paid service, and its cost is covered by the User.  

6.  Performance  of  annual  inspections  of  the  appliance  according  to  the  guidelines  given  in  the 

Operation  and  Maintenance  Documentation,  by  specialized  companies  holding  the  relevant 
licenses  (a  list  of  examples  of  specialized  companies  is  available  from  the  Manufacturer  - 
telephone number 

7.  +48 85 711 94 56), and recording of their performance on the guarantee card.  Inspection of the 

appliance is a paid service.  

8.  Performance  of maintenance  of  the  appliance  (e.g.  adjustment, cleaning, measurement  of the 

appliance, analysis of flue gas) by specialized companies holding the relevant licenses (a list of 
examples of specialized companies is available from the Manufacturer 

– telephone 48 

85  711  94  56),  according  to  the  guidelines  given  in  the  Operation  and  Maintenance 
Documentation, and recording of maintenance services on the guarantee card. The User may 
report a need for intervention by service technicians to the Guarantor (In48 858 880011, 
www.metalfachtg.pl/zglos-problem-online). The maintenance service is a paid service. 

9.  Performance of guarantee repairs solely by specialized companies holding the relevant licenses 

(a  list  of specialized  companies  is  available from  the  Guarantor  -  tel.  +48  85  711  94  56),  and 
recording of their performance on the guarantee card.  

10.  Use  of 

spare  parts  and  consumables  meeting  the  manufacturer’s  specifications.  It  is 

recommended to use original spare parts. 

11.  The guarantee covers the territory of the Republic of Poland. 
 
 
 

The guarantee does not cover defects of the appliance arising from: 

 
1.  Failure  by  the  User  to  adhere  to  the  conditions  specified  in  the  Operation  and  Maintenance 

Documentation  and  the  instructions  given  therein  concerning  transportation,  installation, 
operation, use and maintenance of the appliance; 

2.  Improper storage and transportation by the User; 
3.  Damage to subassemblies of the appliance due to the application of improper electrical voltage 

by  the  User.  In  the  case  of  direct  or  indirect  power  supply  to  the  appliance  from  power 
generators,  UPS  systems  or  devices,  the  User  should  consult  the  specifications  of  power 
supply devices with the manufacturer;  

4.  Defects of the appliance caused by a defective heating installation connected to the appliance; 
5.  Overheating of the boiler by the User; 
6.  Connection,  by  the  User,  of  the  boiler  to  a  closed-loop  system  without  the  application  of  the 

appropriate cooling device. 

7.  Application by the User of improper fuel or fuel of poor quality; 
8.  Independent modification of the appliance by the User. 

 
 
 
 

Summary of Contents for SMART EKO-CARBON Series

Page 1: ...SMART EKO CARBON OPERATION AND MAINTENANCE DOCUMENTATION ENGLISH TRANSLATION OF THE ORIGINAL MANUAL ISSUE I 2018 04 01...

Page 2: ...rent norms and standards guaranteeing safety and dependable use Using the device in accordance with the provided manual ensures effective and dependable operation The boiler is not meant to be operate...

Page 3: ...28 Warranty claim 30 Start up report 32 Start up report 34 List of tables Tab 4 1 Boiler equipment 4 Tab 7 1 Boiler dimentions mm SMART EKO CARBON 6 Tab 8 1 Technical specifications SMART EKO CARBON...

Page 4: ...on USER The maintenance and operation documentation is a part of the product that comes with the delivered boiler The Operation and Maintenance Documentation contains data concerning the design instal...

Page 5: ...s 1 ATTENTION The user should thoroughly read the instruction manual of the regulator fan and feeder along as well as the burner ATTENTION METAL FACH reserves the right to implement changes to the par...

Page 6: ...CARBON 30 180mm does not have a damper The ash pan for waste material from the furnace is situated under the burner The steel door is lined with insulating panels from the inside The boiler is equipp...

Page 7: ...er dimentions mm SMART EKO CARBON TYPE SMART EKO CARBON 15 SMART EKO CARBON 20 SMART EKO CARBON 25 SMART EKO CARBON 30 A 1270 1270 1310 1310 B 545 545 590 590 C 1300 1350 1350 1450 D 545 615 710 710 E...

Page 8: ...3 3 3 Maximum working temperature C 95 95 95 95 Test pressure bar 4 5 4 5 4 5 4 5 Boiler class 5 5 5 5 Boiler efficiency 90 90 90 90 Single fuel load L 200 200 200 200 Fuel eco pea coal Power supply...

Page 9: ...face the exhaust ventilation should be provided by an exhaust duct of 14 x 14 diameter and made from noncombustible material Its outlet should be installed under the ceiling of the boiler room The exh...

Page 10: ...Boiler installation USER INSTALLER The important element of installation is correct setting and levelling of the SMART EKO CARBON boilers The boilers do not require special base and need to be levele...

Page 11: ...Easily ignited Asphalt plywood celluloid compound polyurethane polystyrene polyethylene plastics PVC 13 Connecting the boiler to the heating system INSTALLER The connecting of the boiler to the centr...

Page 12: ...l pipe RB Safety pipe T1 Temperature P1 Pressure Schematic 13 2 Connecting boilers to the heating system diagram Tab 13 2 Symbols applied in the schematics Designation Key T Temperature sensor Tk Boil...

Page 13: ...6 Heating circle 7 Floor heating 8 Central heating pump CO 9 N 10 N 11 R 12 M 13 P 14 O 15 O 16 P Schematic 13 4 Connecting the boiler to the heating system with Laddomat and buffer 9 Central heating...

Page 14: ...Preventing heightened pressure Safetly fixtures It includes safety valve manometer and deaerator ATTENTION The boiler installed in the closed system must be equipped with all the safety devices liste...

Page 15: ...d deaerates the installation The vessel should be installed in the top most point of the installation and if possible vertically above the boiler boilers The capacity of the vessel should be calculate...

Page 16: ...culation BH upper CT4 buffer temp sensor BL lower CT4 buffer temp sensor WS CT6 P weather temperature sensor FT CT2S flue gas temp sensor TR universal thermostat of mixer open close H outlet for contr...

Page 17: ...ulated circuit temperature sensor mixer 4 CT4 type RM3 mixer 3 room thermostat RM4 mixer 4 room thermostat FS BU feeder fuel level sensor H2 outlet to the back up boiler control or alarm or hot tap wa...

Page 18: ...chimney and the closest tree top line should be at least 6m 18 Boiler start up USER INSTALLER ATTENTION The controller settings can be regulated depending on the variety of the existing central heatin...

Page 19: ...ler do not place any flammable material in the close vicinity of the boiler during ash removal any flammable materials should be kept at a distance of 150 cm from the boiler the ash should be placed i...

Page 20: ...ling Eye hole sealing Door sealing Feeder sealing Door handle 23 Possible faults and malfunctions USER Before calling the helpline read the FAQ section of the manual ATTENTION Please remember that in...

Page 21: ...on the flue Check the sealant on the door Regulate the airflow Regulate the controller or call the helpline Why is there grime in the boiler There are few conditions in which grime collects in the bo...

Page 22: ...tral tap water circuit If the water in the tank is kept below 50o C the bacteria settles The situation is possible to take place when the tank temperature is kept below 50o C or when the taps are rare...

Page 23: ...ature exceeds 90o C The hold time is too short Cool down the boiler What does the fumes sensor damaged alarm mean It means that the fumes temperature has exceeded 320o C The fumes temperature sensor i...

Page 24: ...e guidelines given in the appliance s Operation and Maintenance Documentation 5 Performance of first boiler start up within 6 months from the date of the appliance s installation by the fitter in acco...

Page 25: ...y a specialized company indicated by the Guarantor 6 Performance of the obligations arising from the guarantee will occur within 14 work days counting from the date on which the appliance is made avai...

Page 26: ...25 Confirmation of performance of inspection guarantee repair maintenance service Item no Date of performance Description of performed activities Contractor s signature and seal 1 2 3 4 5 6 7 8 9...

Page 27: ...26 10 11 12 13 14 15 16 17 18 19 20...

Page 28: ...2 Norm PN EN ISO 12100 2012 Safety of machinery Basic concepts principles for design part 1 Basic terminology Methodology 3 Norm PN EN 1708 1 2010 Welding Basic welded joint details in steel Part 1 Pr...

Page 29: ...ms pursuant to the act of 29 August 1997 on personal data protection consolidated text Journal of Laws of 2014 item 1182 The User has the right to access their personal data correct them demand cessat...

Page 30: ...29...

Page 31: ...ty in accordance with the Personal Data Protection Act dated 29 08 1997 Dz Ust No 133 item 883 legible signature of Purchaser The Producer is obligated to take warranty actions within 14 days from rec...

Page 32: ...31...

Page 33: ...is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feeder and boiler S...

Page 34: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Page 35: ...screw rotation is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feed...

Page 36: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Page 37: ...36...

Page 38: ...METAL FACH JACEK KUCHAREWICZ UL SIKORSKIEGO 66 16 100 SOK KA TEL 48 85 711 94 54 WWW METALFACH COM PL SERVICE INFOLINE CALL US 48 663 453 222 WRITE TO US p czepiel metalfach com pl...

Reviews: