Report on the first start-up of the boiler
(Copy of the owner of the central heating boiler )
In order to verify the purchase and recognise the validity of the warranty, a report must be sent within 30 days
from the date of first use. This can be done by:
1.
Email - which will include a scan or photo of the report.
2.
Letter - in which a copy of the report will be sent to the company METAL-FACH Jacek Kucharewicz, the
address of the company can be found at the end of the Technical and Operational Document.
Boiler room
Meets
Does not meet
Comment
The conditions contained in the DTR in chapter "
Requirements for the boiler house and boiler installation"
are complied with.
The conditions contained in the DTR in chapter "Connecting
the boiler to the chimney" are observed.
Central heating system.
Meets
Does not meet
Comment
The conditions in the DTR in chapter "Connecting the boiler
to the heating system" are observed.
The conditions in the DTR chapter "Requirements for the
expansion vessel" are complied with.
There is no other source of heating. If there is does it affect
the operation of the boiler and how?
Protection of the system against freezing.
Connecting components to the electrical installation
Meets
Does not meet
Comment
The conditions specified in the DTR in the chapter
"Connecting the boiler to the electrical installation" are
observed.
Accessory test
Meets
Does not meet
Comment
The sensors are positioned in the right place.
Sensor readings are consistent with the actual condition.
The direction of rotation of the fan is correct.
Opening the fan flap using the blowing force.
The direction of rotation of the worm is correct.
Boiler start-up
Meets
Does not meet
Comment
The tightness of the hydraulic connection of the boiler to the
system is maintained.
Fireman's system test (if installed).
Check the connection of the fuel feeder to the boiler.
Filling the fuel tank with fuel.
Summary of Contents for SEG PELLET
Page 1: ......
Page 2: ......
Page 10: ...METAL FACH Heating Technology 8 SEG PELLET boiler...
Page 13: ...METAL FACH Heating Technology 11...
Page 42: ...METAL FACH Heating Technology 40...
Page 48: ...METAL FACH Heating Technology 46...
Page 50: ...METAL FACH Heating Technology 48...
Page 52: ...METAL FACH Heating Technology 50...
Page 59: ......
Page 60: ......