condensate drainage to the drainage grating. A distance of at least 6 m should be kept between the chimney
and the nearest edge of a tree crown.
Commissioning the boiler
(User | Installer)
ATTENTION!
The controller settings are freely adjustable due to the variety of existing central heating
installations, heat demand of the building and fuel calorific value. The user sets the boiler
operation parameters himself. This activity is not subject to service.
SEG BIO boilers are equipped with one combustion chamber - the bottom one with a built-in hearth.
First start-up of the boiler - checking the connections
Before the first start-up of the boiler check all the screw connections and tighten them if there is any looseness.
If the boiler was disassembled to bring it to the boiler room, remember to properly seal the boiler frame -
burner interface (high temperature silicone). The next step is to connect all electrical devices controlled by the
boiler (pumps, actuators, valves, etc.), and to connect temperature sensors in accordance with the installation
diagram.
ATTENTION!
Incorrect placement of the sensors may result in malfunction of the boiler.
TIP!
If all the above steps have been completed you can proceed to the boiler commissioning
procedure.
Summary of Contents for SEG BIO
Page 1: ......
Page 2: ......
Page 46: ...METAL FACH Heating Technology 44 ...
Page 52: ...METAL FACH Heating Technology 50 ...
Page 54: ...METAL FACH Heating Technology 52 ...
Page 56: ...METAL FACH Heating Technology 54 ...
Page 63: ......
Page 64: ......