14
ASSEMBLY STEP 4
For Sliding and Swinging Gates Only
Install the Chain/Cable
1. Pull the cable loop from
the carton and fasten it to
the trolley with a master
link from the hardware
bag (Figure 1).
• Push pins of master link
bar through cable loop
and hole in front end of
trolley.
• Push master link cap over pins and past
pin notches.
• Slide clip-on spring over cap and onto pin
notches until both pins are securely locked
in place.
2. To prevent the trolley from jamming against the
opener during operation, position trolley 5 to 15 cm
from the stop hole as shown. Then dispense the
chain around the opener sprocket (Figure 1). Make
sure the sprocket teeth engage the chain.
• Proceed around to the pulley bracket and forward
to the threaded trolley shaft.
3. Use the second master link to connect the chain to
the flat end of the shaft (Figure 1).
Check to make
sure the chain is not twisted.
To avoid possible SERIOUS INJURY to fingers from
moving opener:
• ALWAYS keep hand clear of sprocket while operating
opener.
• Securely attach sprocket cover BEFORE operating.
WARNING
CAUTION
WARNING
WARNING
Leave Chain
& Cable
Inside Carton to
Prevent Kinking
Keep Chain
Taut When Dispensing
Sprocket
Motor Unit
Mo
u
nting
Plate
Install Chain
and Cable
in this Direction
Ca
b
le Loop
Master
Link Pin
Master Link
Clip-On Spring
Master Link
Clip-On Spring
Flat End
of Trolley
Trolley
Pin
N
otch
Flat End of
Threaded Shaft
Master
Link Cap
Ca
b
le
T-rail
Master
Link Cap
Chain
Chain Link
Trolley Stop
(Hex Bolt)
m
c
5
1
-
5
Pin
N
otch
Master
Link
Pin
Figure 1