4. Operation
Wear protective gear at all times when operating auger, such as hard
hats, protective shoes, eye protection, and gloves. Do not wear loose
clothing, and be sure that hair is tied back.
4.1 Pre-Operation Checklist
_
Before operating the auger, the operator must follow this checklist:
All safety shields are in place, secure, and in good working order.
Lift cable is properly aligned in pulley. Clamps are secure.
Fasteners are secure.
PTO driveline is securely attached to driveshaft and tractor.
PTO driveline rotates freely.
PTO driveline telescopes easily.
Tube alignment is reasonably straight.
Auger wheels and tractor wheels are chocked.
Intake hopper and discharge spout are free of any obstructions.
A second qualified person is present during operation.
All operators have read manual and are aware of safety
precautions.
Maintenance has been performed properly.
Power to PTO and hydraulic system is in o
ff
position before starting
tractor.
Hydraulic system has been thoroughly checked for leaks. (see
Section 5 “Hydraulics” for details).
12
Summary of Contents for HARVEST T1062
Page 21: ...21...
Page 22: ...22...
Page 23: ...23...
Page 24: ...24...
Page 29: ...29 7 6 7 6 3 57 66 0 6 5 37 21 5 9 8 5 02 6 5 1 12 78 66 0 0 6 7 21 7 3 7 7...
Page 31: ...31 7 6 7 6 3 57 66 0 6 5 37 21 5 9 8 5 02 6 5 1 12 78 66 0 6 5 7 3 7 7...
Page 32: ...32 7 6 3 57 66 0 6 5 37 21 5 9 8 5 02 6 5 1 12 78 66 0 6 5 7 3 7 7...
Page 36: ...36...