
Data Panel (continued)
What does the Data Panel display
after
you click the Start Program
button?
Note:
This data is logged in a report.
The stroke count would be included
in the logged data at this time if you
had entered that information in the
Pump Info
sub-tab.
Start Program
Begin Test
Note:
You can monitor the pressure
and temperature readings before
beginning a timed test. After you are
satisfied that your initial test criteria
is met, you start the timed test by
clicking the
Begin Test
button.
What does the Data Panel display
after
you click the Begin Test
button?
Note:
this Elapsed Time is identical to
what you see displayed in the
Details
tab.
Summary of Contents for PIT5000
Page 1: ...The PIT5000 Pipeline Integrity Tester A Pipeline Hydrostatic Testing Device...
Page 2: ...Introductory information Notification Statements Disclaimer Copyright...
Page 6: ...Protect the PIT5000 Protect the PIT5000 Do not substitute parts...
Page 12: ...Hardware Recommended power connections...
Page 13: ...Temporary power connections...
Page 19: ...3 Computer pane Computer pane 4 Measure pane Measure pane 1 2 3 4...
Page 33: ...PC Setup sub tab continued Build Report button...