Page 4A-56
90-884294 OCTOBER 2001
d. Plug tester into electrical outlet.
e. Observe temperature at which thermostat begins to open. (Thermostat will drop off
thread, that was installed in Step “a”, when it starts to open.) Thermostat must begin
to open when temperature reaches 118
°
-122
°
F (48
°
-50
°
C).
f.
Continue to heat water until thermostat is completely open.
g. Unplug thermostat tester.
h. Replace thermostat if it fails to open at the specified temperature, or if it does not fully
open.
NOTE : BE SURE that water in thermostat tester is allowed to cool sufficiently [below 110
°
F
(43
°
C)] before testing the other thermostat.
51087
Powerhead Reassembly and Installation
General
Before proceeding with powerhead reassembly, be sure that all parts to be re-used have
been carefully cleaned and thoroughly inspected, as outlined in “Cleaning and Inspection,”
preceding. Parts, which have not been properly cleaned (or which are questionable), can
severely damage an otherwise perfectly good powerhead within the first few minutes of op-
eration. All new powerhead gaskets MUST BE installed during reassembly.
During reassembly, lubricate parts with 2-Cycle Outboard Oil whenever “light oil” is speci-
fied. Mercury/Quicksilver part numbers of lubricants, sealers and locking compounds are
listed in “Mercury/Quicksilver Lubricants and Sealants” located in section 1A, and special
tools are listed in “Powerhead General Information,” preceding.
A torque wrench is essential for correct reassembly of powerhead. DO NOT attempt to
reassemble powerhead without using a torque wrench. Attaching bolts for covers, housings
and cylinder heads MUST BE torqued by tightening bolts in 3 progressive steps (following
specified torque sequence) until specified torque is reached (see “Example,” following).
EXAMPLE: If cylinder head attaching bolts require a torque of 30 Ib. ft. (41 N·m), a) tighten
all bolts to 10 Ib. ft. (13.5 Nm), following specified torque sequence, b) tighten all bolts to
20 Ib. ft. (27 Nm), following torque sequence, then finally c) tighten all bolts to 30 Ib. ft. (41
Nm), following torque sequence.
Summary of Contents for 225 EFI
Page 64: ...IGNITION Page 2A 8 90 884294 OCTOBER 2001 Coil Plate Assembly...
Page 66: ...IGNITION Page 2A 10 90 884294 OCTOBER 2001 Electrical Plate Assembly A...
Page 68: ...IGNITION Page 2A 12 90 884294 OCTOBER 2001 Electrical Plate Assembly A...
Page 100: ...CHARGING STARTING SYSTEM 90 884294 OCTOBER 2001 Page 2B 9 Notes...
Page 101: ...CHARGING STARTING SYSTEM Page 2B 10 90 884294 OCTOBER 2001 Flywheel Alternator...
Page 159: ...WIRING DIAGRAMS 90 884294 OCTOBER 2001 Page 2D 9 Notes...
Page 220: ...FUEL PUMP 90 884294 OCTOBER 2001 Page 3A 3 Notes...
Page 221: ...FUEL PUMP Page 3A 4 90 884294 OCTOBER 2001 Fuel Pump Assembly A...
Page 235: ...FUEL INJECTION Page 3B 6 90 884294 OCTOBER 2001 Fuel Management System...
Page 237: ...FUEL INJECTION Page 3B 8 90 884294 OCTOBER 2001 Fuel Management System...
Page 239: ...FUEL INJECTION Page 3B 10 90 884294 OCTOBER 2001 Vapor Separator Components...
Page 293: ...OIL INJECTION 90 884294 OCTOBER 2001 Page 3C 3 Notes...
Page 294: ...OIL INJECTION Page 3C 4 90 884294 OCTOBER 2001 Oil Injection Components...
Page 317: ...POWERHEAD 90 884294 OCTOBER 2001 Page 4A 5 Notes...
Page 385: ...POWERHEAD 90 884294 OCTOBER 2001 Page 4A 73 Notes...
Page 407: ...COOLING Page 4B 8 90 883728 JULY 2001 Notes...
Page 701: ...COLOR DIAGRAMS Page 8 2 90 884294 OCTOBER 2001 Notes...
Page 716: ...58847 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28...
Page 719: ...7 7 14 59162 1 17 16 2 3 4 5 6 8 8 9 1 16 12 13 14 15 10 11 11 17 1 1...