![Merck EMD Millipore NovAseptic Installation And User Manual Download Page 25](http://html1.mh-extra.com/html/merck/emd-millipore-novaseptic/emd-millipore-novaseptic_installation-and-user-manual_1772766025.webp)
Maintenance Checklist
To ensure safety and proper performance, perform quarterly inspection of
the GMP ATEX Mixer according to the following table. Make copies of this
table to use at each inspection. Refer to applicable instructions within this
guide.
Note:
Follow all installation recommendations, cautions and
warnings in this manual.
Vessel ID
_______________________________________________________________________
Inspection date
__________________________________________________________________
Volume
________________________________________________________________________
Manufacturer
___________________________________________________________________
Date of manufacture
______________________________________________________________
Design pressure
_________________________________________________________________
Design temperature
______________________________________________________________
Product description
_______________________________________________________________
Viscosity ________________________________________________________________________
Component / Maintenance Check
Notes
Complete
1
Drive Unit
Check cables for damage
q
yes
q
no
Check the gearbox for leakage
q
yes
q
no
Check the gearbox for noise
q
yes
q
no
Check for any contact mark on Tank Plate
q
yes
q
no
Check shaft and outer drive head rotation and
wobbling movement
q
yes
q
no
Check outer drive head for damage caused by
contact with Tank Plate
q
yes
q
no
Ensure bolt, screws, nuts and flange are in
good condition and free of damage
q
yes
q
no
NovAseptic
®
GMP ATEX Mixer
25
Summary of Contents for EMD Millipore NovAseptic
Page 2: ...2 Installation and User Guide ...
Page 4: ...4 Installation and User Guide ...
Page 31: ...NovAseptic GMP ATEX Mixer 31 ...