background image

1

2

3

4

5

Door Gable

AI-GRO1008DD-V2DG

Plain Gable

AI-01GRO1008DD-V2WG

Window Side QTY 2

AI-01GRO1008DD-V2WS

Plain Side QTY 2

AI-01GRO1008DD-V2PS

Floor QTY 2

AI-01GRO1008DD-V2F

6

7

 Door

AI-01-21ZB675X1720-V1

8

Roof Panel QTY 2

AI-01GRO1008DD-V2RP

9

Opening Window  QTY 2

AI-01OW-V1

Bunk Support - 2920mm

F4458-2920mm

Roof Block - 793mm QTY 2

F4458-793mm

Fascia - 1480mm QTY 4

S1295-1480mm

Window Trim - 1000mm QTY 2

S1240-1000mm

Cover Trim - 1640mm QTY 6

S1256-1640mm

Door Trim - 1443mm

S1245-1443mm

Door Trim - 1722mm QTY 2

S1245-1722mm

Fascia Block - 120mm QTY 4

F2744-120mm

Finial QTY 2

Butt Hinge  

PI-07-0066

QTY 4

T-Hinge 

PI-07-0021

QTY 6

Tower Bolt

PI-07-0030

Casement Stay 

PI-07-0005

QTY 2

“L” Bracket

PI-07-0012

 QTY 2

Bolt Block

120mm

50mm Screw x52

40mm Screw x30

Felt Tacks x180

20mm Screw x36

30mm Screw x116

16mm Screw x24

Nail Bag

Cloaking strip - 1670mm

F2744-1670mm

70mm Screw x10

P 2

01PTGRO1008DD-V3

Overall Dimensions:

 

Length = 3147mm 

Width = 2627mm 

Height = 2230mm 

Base Dimensions: 

Length = 2998mm 

Width = 2387mm 

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Hasp & Staple

PI-07-0191

Pre drill 

hole

30mm 

screw

40mm 

screw

Step 1

Remove transportation blocks

from the bottom of each panel

before assembling the building.

Pre-Assembly

Fix the door trim 

(No. 15 &16)

 onto the

front of the door gable using

4x40mm screws per strip.

The frames should sit 13mm

from the door aperture.

Attach the doors 

(No. 6)

 to the 

building using the

T-hinges 

(No. 20)

 and 7x30mm

screws per hinge.

42x30mm Screws

12x40mm Screws

13mm

16

20

16

15

15

16

Reviews: