background image

Step 2

Place the floor panels 

(No. 

5) 

onto a firm & level base,

ensure the base has 

suitable drainage free from 

areas where standing 

water can collect.

Secure the floors together 

using 10x50mm screws 

fixing in an alternating 

pattern.

10x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

Place the plain gable 

(No. 

2) 

and the window sides 

(No. 3) 

onto the floor and 

secure using 6x50mm 

screws. 

DO NOT

 secure the 

building to the floor until 

the roof is fixed in place.

6x50mm Screws

Pre drill 

hole

50mm 

screw

5

5

2

3

* Window panels can

be placed on either

side of the building.

Using the same method outlined

in Step 3, fix the plain sides 

(No. 

4)

 & the door gable 

(No. 1) 

using 

12x50mm screws.

DO NOT

 secure the building to

the floor until the roof is

fixed in place.

Step 4

12x50mm Screws

Pre drill 

hole

50mm 

screw

Step 5

Fix the roof panels 

(No. 7) 

to the

building. Ensure the framing 

fits into the slot at the top 

of the gables.

Secure in place using 12x30mm 

screws per roof panel.

24x30mm Screws

Pre drill 

hole

30mm 

screw

7

7

3

4

4

1

P 3

Please retain product label and instructions for future reference

             

Reviews: