Step 2
Place the floor panels
(No.
5)
onto a firm & level base,
ensure the base has
suitable drainage free from
areas where standing
water can collect.
Secure the floors together
using 10x50mm screws
fixing in an alternating
pattern.
10x50mm Screws
Pre drill
hole
50mm
screw
Step 3
Place the plain gable
(No.
2)
and the window sides
(No. 3)
onto the floor and
secure using 6x50mm
screws.
DO NOT
secure the
building to the floor until
the roof is fixed in place.
6x50mm Screws
Pre drill
hole
50mm
screw
5
5
2
3
* Window panels can
be placed on either
side of the building.
Using the same method outlined
in Step 3, fix the plain sides
(No.
4)
& the door gable
(No. 1)
using
12x50mm screws.
DO NOT
secure the building to
the floor until the roof is
fixed in place.
Step 4
12x50mm Screws
Pre drill
hole
50mm
screw
Step 5
Fix the roof panels
(No. 7)
to the
building. Ensure the framing
fits into the slot at the top
of the gables.
Secure in place using 12x30mm
screws per roof panel.
24x30mm Screws
Pre drill
hole
30mm
screw
7
7
3
4
4
1
P 3
Please retain product label and instructions for future reference
Summary of Contents for GROUNDSMAN 10 X 8
Page 1: ...P 1 x2 10 X 8 Groundsman ASSEMBLY INSTRUCTIONS 01PTGRO1008DD V3...
Page 7: ...P 7...
Page 8: ...P 8 1 2...
Page 9: ...P9...